Regeneration and maintenance of water intake wells
Brabant Water NV has a non-public tender for the regeneration and maintenance of water intake wells (groundwater wells) used for purification into drinking water. The contract concerns approximately 20 water intake wells annually. The contracting authority expects a technically expert partner with experience in inspecting, cleaning, repairing, and reconfiguring water intake wells, including compliance with Dutch water and environmental regulations. The works include, among other things, the removal of sediment, the replacement of damaged parts, testing water quality, and preparing reports. The contractor must have a suitable team, the correct tools, and a flexible scheduling system to ensure the continuity of drinking water production. The tender focuses on quality, safety, and cost control, with an emphasis on sustainable and environmentally friendly solutions.
Works · Restricted · National procedure
01What is being requested
Brabant Water NV has a non-public tender for the regeneration and maintenance of water intake wells (groundwater wells) used for purification into drinking water. The contract concerns approximately 20 water intake wells annually. The contracting authority expects a technically expert partner with experience in inspecting, cleaning, repairing, and reconfiguring water intake wells, including compliance with Dutch water and environmental regulations. The works include, among other things, the removal of sediment, the replacement of damaged parts, testing water quality, and preparing reports. The contractor must have a suitable team, the correct tools, and a flexible scheduling system to ensure the continuity of drinking water production. The tender focuses on quality, safety, and cost control, with an emphasis on sustainable and environmentally friendly solutions.
Regeneration and maintenance of water intake wells that extract groundwater for purification into drinking water. Approximately 20 water intake wells per year.
02Outcome
Wabron
03Breakdown by lot
Per-lot values not published — bars show only the lot breakdown.
04Value in context
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What does the assignment for the regeneration and maintenance of water intake wells entail?
What is the scope of the works regarding the water intake wells?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159