AwardedWorksRestrictedGreen

Reconstruction Kruislandseweg Municipality of Halderberge

Gemeente Halderberge · Restricted · 1 lots · 349007
Type
Works
45233000
Estimated value
€ 100K
awarded
To deadline
Ongoing
Knock-outs
3
exclusion grounds
Award basis
Best price-quality ratio
4 criteria
Assess manuallyconfidence high

This project concerns the reconstruction of the Kruislandseweg in Oud Gastel via a construction team collaboration. The assignment includes traffic measures, the construction of roundabouts, and the realization of a new park area.

Works · Restricted · National procedure

Sustainability counts3 exclusion groundsComplete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
€100,000
awarded value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksGreen / SPP

01What is being requested

The assignment concerns the reconstruction of the Kruislandseweg in Oud Gastel, including the realization of roundabouts, bicycle paths, a bus hub, and a park area. The project is executed via a construction team in which the contractor is also responsible for the coordination of utility companies.

The Kruislandseweg is the entrance road to the village of Oud Gastel and forms an important traffic connection. Connected to the Provincialeweg Zuid (N268), this road opens up the village and provides connection to the A17 motorway. From the north side, the road provides access to the village with the center area, and on the south side to two industrial estates and various residences. Currently, the road is an important traffic artery with speeds of 70 and 80 kilometers per hour and consists of carriageways, central verges, and entry and exit lanes. The road will be downgraded and various traf

45233000Works
1Kruislandseweg reconstruction

02Outcome

Awarded

Dura Vermeer Infra Regionale Projecten BV

Award value
€100,000
Bidders
5

03Strategic insight

Strategic insight · AI analysis
Ensure that the reference for the core competency is not older than five years. Note that in a combination of parties, every participant must meet the suitability requirements. Ensure a fully completed UEA to prevent exclusion.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
The tender follows a national non-public procedure.Important
There is a ceiling amount of € 3,150,000.00 excl. VAT for the entire assignment.Important
For the construction team phase, a ceiling amount of € 160,000.00 excl. VAT applies.Important
The contractor is responsible for the coordination of utility companies.Important
All general terms and conditions of the Municipality of Halderberge apply.Important

05Can I take part?

Technical · 2
Core competency 1: Experience with the realization and delivery of a civil engineering work in a construction team (based on the BNL2021 or DG2020 model or similar) with a minimum contract value of € 1,750,000.00 where the candidate was ultimately responsible for the daily organization and management.Technical
Core competency 2: Quality and Safety (certified quality management system).Technical
Exclusion ground · 3
Exclusion grounds regarding criminal convictions (Part III A UEA).Exclusion ground
Exclusion grounds regarding payment of taxes or social security contributions (Part III B UEA).Exclusion ground
Exclusion grounds regarding insolvency, conflicts of interest, or professional errors (Part III C UEA).Exclusion ground

06Exclusion grounds

Exclusion grounds (3)
  • Exclusion grounds regarding criminal convictions (Part III A UEA).
  • Exclusion grounds regarding payment of taxes or social security contributions (Part III B UEA).
  • Exclusion grounds regarding insolvency, conflicts of interest, or professional errors (Part III C UEA).

07Award criteria

Sustainabilityweight n/a

Assessment of sustainability.

Cost controlweight n/a

Assessment of cost control.

Vision for collaborating in construction teamweight n/a

Assessment of the vision for collaboration within the construction team.

Environmental managementweight n/a

Assessment of the environmental management.

08Process & timeline

Selection phase: Publishing selection guidelines
2024-09-12
Selection phase: Closing deadline for submitting questions
2024-09-26
Selection phase: Publication of Notice of Clarifications
2024-10-08
Selection phase: Closing deadline for submission of the application
2024-10-17
Selection phase: Announcement of intended selection
2024-10-28
Selection phase: Information meeting for the five selected contractors
2024-11-07
Selection phase: Announcement of final selection / invitation to award phase
2024-11-14
Award phase: Publishing award guidelines
2024-11-14
Award phase: Closing deadline for submitting questions
2024-11-28
Award phase: Publication of Notice of Clarifications
2024-12-09
Award phase: Closing deadline for submission of the bid
2025-01-09
Award phase: Interviews
2025-week 4
Gunningsfase: Bekendmaking voorgenomen gunning
2025-02-06
Gunningsfase: Bekendmaking definitieve gunning
2025-02-17
Realisatiefase: Oplevering
2025-december

09Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

10Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME10058×
2Boskalis Nederland B.V.SME8969×
3BAM Infra B.V.SME8777×
4Van Gelder BVSME8753×
5Heijmans Infra B.V.SME8765×
6De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME8726×

11Tender documents

TN476607 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250303105739pdfMar 3, 2025 · 13 KB
Bijlage 5 DO tekening binnen bebouwde kompdfSep 12, 2024 · 9726 KB
Bijlage 3 Verklaring referentie selectiecriteriadocxSep 12, 2024 · 36 KB
Bijlage 3a selectiecriterium aanspreekpunt afstand tot locatiedocxSep 12, 2024 · 21 KB
Bijlage 4 Algemene inkoopvoorwaarden gemeente HalderbergepdfSep 12, 2024 · 146 KB
TN476607 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240912173548pdfSep 12, 2024 · 17 KB
Bijlage 1 Uniform Europees AanbestedingsdocumentpdfSep 12, 2024 · 1395 KB
Bijlage 2 Verklaring referentie voor kerncompetentie 1docxSep 12, 2024 · 27 KB
Bijlage 9 Klachtenregeling aanbestedingen gemeente HalderbergepdfSep 12, 2024 · 192 KB
Bijlage 6 Toelichting ontwerpvisie binnen bebouwde kompdfSep 12, 2024 · 23021 KB
Selectieleidraad aannemer Kruislandseweg Halderberge 12-9-24pdfSep 12, 2024 · 438 KB
Bijlage 8 DO tekening buiten bebouwde kom 2pdfSep 12, 2024 · 2605 KB

12Legal themes that may be relevant here

13Frequently asked questions

What is the content of the reconstruction of the Kruislandseweg?
The project includes the downgrading of the road, the implementation of traffic measures such as roundabouts at both intersections, and the integration of a bus hub. Additionally, a park area with new greenery and a water storage facility will be constructed to support the HWA sewerage system.
Which traffic changes are being implemented in the built-up area?
Within the built-up area (BIBEKO), the zone from the N268 roundabout to the Kruidenlaan/Watermolen intersection, the maximum speed will be reduced from 70 to 50 km/h to increase traffic safety and the sense of welcome for cyclists, pedestrians, and motorists.
What is the function of the new water storage in the project?
The construction of the water storage is part of the new park area and is intended to support both the road and the HWA sewerage system already constructed in the center area.

Automatically compiled from the official tender data and documents.

14Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 100K

Gegunde waarden in CPV 45 · werken n=3159