ClosedSuppliesEuropeanOnderhandeling zonder bekendmaking

Realization and Delivery of Möbius2 Modules DSM and ASM

Nederlandse Organisatie voor toegepast-natuurwetenschappelijk onderzoek TNO · Onderhandeling zonder bekendmaking · 1 lots · 313641
Type
Supplies
42990000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This tender from TNO concerns the realization and delivery of the Möbius2 modules DSM and ASM, aimed at improving the quality of mechanically recycled plastic and the efficiency of chemical recycling. TNO’s Circular Plastics programme aims to increase recycling potential and reduce dependence on fossil raw materials through the Möbius technology. The assignment is an award procedure without publication, in which one contractor will be selected to develop, test, and deliver the modules. The contractor must have experience with chemical recycling, modular design, and the production of high-tech components, and be capable of delivering within the specified time and budget. The collaboration requires close coordination with TNO’s R&D teams and compliance with strict quality and safety standards. The chosen partner will provide a complete solution, including engineering, manufacturing, and aftercare.

Supplies · Onderhandeling zonder bekendmaking · European procedure

European
Contract type
Supplies
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 42SuppliesEU tenderMöbiusDSMASM

01What is being requested

This tender from TNO concerns the realization and delivery of the Möbius2 modules DSM and ASM, aimed at improving the quality of mechanically recycled plastic and the efficiency of chemical recycling. TNO’s Circular Plastics programme aims to increase recycling potential and reduce dependence on fossil raw materials through the Möbius technology. The assignment is an award procedure without publication, in which one contractor will be selected to develop, test, and deliver the modules. The contractor must have experience with chemical recycling, modular design, and the production of high-tech components, and be capable of delivering within the specified time and budget. The collaboration requires close coordination with TNO’s R&D teams and compliance with strict quality and safety standards. The chosen partner will provide a complete solution, including engineering, manufacturing, and aftercare.

Plastic circularity is promising with regard to reducing dependence on fossil raw materials and thereby geopolitics. Therefore, TNO has established a Circular Plastics programme. To exploit the recycling potential, a higher quality of mechanically recycled plastic is required, as well as increased efficiency of chemical recycling. One of the promising technologies to upgrade plastics is depolymerization. TNO-SPES is working on this technology under the name Möbius. The goal of the conducted negotiated procedure was to select one (1) contractor for the Realization and Delivery of Möbius2 Module

42990000Supplies
1Möbius2 Modules DSM and ASM€1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Xylem Water Solutions Nederland B.V.SME65
2InfraTec GmbH Infrarotsensorik und MesstechnikUnknown63
3Sulzer Pumps Wastewater Netherlands B.V.SME5862×
4De Groot Houtbewerkingsmachines B.V.SME54
5Haller benelux B.V.SME53
6Terberg Matec Nederland B.V.SME53

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the Möbius2 modules DSM and ASM?
The realization and delivery of these modules are aimed at improving the quality of mechanically recycled plastic and increasing the efficiency of chemical recycling within the Circular Plastics programme.
Which technology is applied in this project?
The project utilizes the Möbius technology from TNO-SPES, in which depolymerization is used as a method to upgrade plastics and exploit the recycling potential.
What is the scope of the assignment for the selected contractor?
The contractor is responsible for the realization and delivery of the Möbius2 Modules DSM and ASM, with the aim of reducing dependence on fossil raw materials.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 300K
median
€ 800K
p75
€ 4,0 mln
deze opdracht

Gegunde waarden in CPV 42 · leveringen n=273