ClosedWorksEuropean

Realisation Partner Sluisjesdijk 2.0 Technical Migration

Waterschap Hollandse Delta · 1 lots · 317450
Type
Works
45252140
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Hollandse Delta (WSHD) is seeking a realisation partner for the large-scale renovation of the Sluisjesdijk (SLDK) sludge processing plant, project Sluisjesdijk 2.0. The existing installations, built in 1986, are nearing the end of their service life and must be replaced and made more sustainable. The approach is integrated and modular: each sub-process (e.g., gas holder, switch room, main distributor) is renewed step-by-step while the plant remains fully operational. For each module, a design proposal (VO+) is drawn up in a construction team (bouwteam) context with an engineering firm; this is subsequently followed by a tender and contract with the realisation partner. WSHD retains the option to award specialized assignments as lots or via the lots scheme of the Public Procurement Act. Contracting of the realisation partner is planned for June 2024, with completion of the full renovation by the end of 2029.

Works · European procedure

European
Contracting authority
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendersludge processingrenovationintegrated approach

01What is being requested

Waterschap Hollandse Delta (WSHD) is seeking a realisation partner for the large-scale renovation of the Sluisjesdijk (SLDK) sludge processing plant, project Sluisjesdijk 2.0. The existing installations, built in 1986, are nearing the end of their service life and must be replaced and made more sustainable. The approach is integrated and modular: each sub-process (e.g., gas holder, switch room, main distributor) is renewed step-by-step while the plant remains fully operational. For each module, a design proposal (VO+) is drawn up in a construction team (bouwteam) context with an engineering firm; this is subsequently followed by a tender and contract with the realisation partner. WSHD retains the option to award specialized assignments as lots or via the lots scheme of the Public Procurement Act. Contracting of the realisation partner is planned for June 2024, with completion of the full renovation by the end of 2029.

Slibverwerkingsbedrijf Sluisjesdijk (SLDK) was commissioned in 1986. SLDK processes sludge produced by RWZI Dokhaven and three other RWZI's. The technical installations at Sluisjesdijk are approaching the end of their service life. WSHD is seeking a contractor for the realisation of the large-scale renovation of the Sluisjesdijk sludge processing plant, hereinafter also referred to as 'Project Sluisjesdijk 2.0' or 'Project SLDK2.0'. With the package of measures and investments, SLDK is to be made robust and future-proof again, utilizing realistic and pragmatic possibilities for sustainability.

45252140Works
1Realisation Partner Sluisjesdijk 2.0 Technical Migration€1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9369×
2Heijmans Infra B.V.SME9365×
3KWS Infra B.V.SME9292×
4Combinatie Heijmans - SWARCOUnknown9273×
5BAM Infra B.V.SME9277×
6Dura Vermeer Infra Regionale Projecten BVSME9258×

05Legal themes that may be relevant here

06Frequently asked questions

What is the intended approach for the renovation of the Sluisjesdijk sludge processing plant?
An integrated and modular approach has been chosen, in which sub-processes are renovated step-by-step. This allows the SLDK sludge processing plant to remain fully operational throughout the entire renovation.
How is the design for the various sub-processes established?
For each sub-process, a definitive design (DO) or execution design (UO) is drawn up in a construction team (bouwteam) context with the contractor. This is done based on a preliminary design plus (VO+), which is developed in collaboration with a contracted engineering firm.
What disciplines are the works of this project focused on?
The execution works consist mainly of mechanical (WTB), E&I, and civil engineering works, supplemented by various other fields and disciplines.
What is the expected timeline for the contracting and the full renovation?
The contracting of the realisation partner is scheduled for June 2024, with the aim of completing the full renovation by the end of 2029 at the latest.
Can the contracting authority award specific parts of the renovation separately?
Yes, the contracting authority can award specialized fields or isolated assignments separately in lots. Examples include the realisation of the gas holder, the switch room, the renewal of the main distributor, or the installation of a temporary installation for sludge dewatering.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159