ClosedWorksEuropeanOpen

Realization of WKO sources – Campus Zuid 2nd WVP

Technische Universiteit Delft · Open · 1 lots · 332440
Type
Works
45251000
Estimated value
€ 10M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Delft University of Technology has launched an open tender for the realization of an Aquifer Thermal Energy Storage (WKO) plant on Campus Zuid. The plant must process the supply of cold and heat from approximately 36 heat and cold sources, divided into 6 source doublets in the 2nd aquifer and 12 source doublets in the 3rd aquifer. The plant must then distribute the heat and cold to the connected buildings on the campus. The contract falls under the category of works and requires an integrated approach to piping installations, heat and cooling transport, and building connectivity. The supplier must have experience with large-scale WKO systems, knowledge of Dutch regulations, and the ability to provide a sustainable, energy-efficient solution.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€10,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderWKOheat and cooling plantCampus Zuid

01What is being requested

Delft University of Technology has launched an open tender for the realization of an Aquifer Thermal Energy Storage (WKO) plant on Campus Zuid. The plant must process the supply of cold and heat from approximately 36 heat and cold sources, divided into 6 source doublets in the 2nd aquifer and 12 source doublets in the 3rd aquifer. The plant must then distribute the heat and cold to the connected buildings on the campus. The contract falls under the category of works and requires an integrated approach to piping installations, heat and cooling transport, and building connectivity. The supplier must have experience with large-scale WKO systems, knowledge of Dutch regulations, and the ability to provide a sustainable, energy-efficient solution.

Realization of a WKO plant which processes the supply of cold and heat via pipes from approximately 36 heat and cold sources (6 source doublets in the 2nd aquifer and 12 source doublets in the 3rd aquifer) and subsequently distributes it to the aforementioned buildings to be connected.

45251000€ 10MWorks
1Realization of WKO sources – Campus Zuid 2nd WVP€10,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€10,000,000

04Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9277×
2Combinatie Heijmans - SWARCOUnknown9273×
3Van Gelder BVSME9253×
4Heijmans Infra B.V.SME9165×
5SPIE Nederland B.V.SME8723×
6BAM Bouw en Techniek bvSME8634×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific technical scope of the WKO plant?
The plant must process the supply of cold and heat via pipes from approximately 36 heat and cold sources. This includes 6 source doublets in the 2nd aquifer and 12 source doublets in the 3rd aquifer.
What is the core task of the assignment regarding the realization of the WKO sources?
The assignment involves the realization of a WKO plant that processes cold and heat from the sources and subsequently distributes it to the buildings to be connected on Campus Zuid.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 10 mln

Gegunde waarden in CPV 45 · werken n=3159