ClosedWorksEuropeanOpenGreen

Realisation of a Green Gas Plant

Waterschap Zuiderzeeland · Open · 1 lots · 361071
Type
Works
45232420
Estimated value
€ 8,29M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Zuiderzeeland is inviting an open tender for the realisation of a green gas and CO2 gasification plant that connects to a new sludge digestion plant at AWZI Almere. The contract includes design, construction, supply, installation, testing, commissioning, and a 15-year maintenance and warranty service. The UAV-GC 2005 is applicable, requiring a full project approach with risk and quality management. The contracting authority expects an integrated, sustainable solution that reduces CO2 emissions and maximizes energy production from sludge. The tender focuses on a technically oriented, long-term collaboration with a supplier experienced in green gas technology and CO2 gasification.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€8,294,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPgreen gasCO2 gasificationsludge digestion plant

01What is being requested

Waterschap Zuiderzeeland is inviting an open tender for the realisation of a green gas and CO2 gasification plant that connects to a new sludge digestion plant at AWZI Almere. The contract includes design, construction, supply, installation, testing, commissioning, and a 15-year maintenance and warranty service. The UAV-GC 2005 is applicable, requiring a full project approach with risk and quality management. The contracting authority expects an integrated, sustainable solution that reduces CO2 emissions and maximizes energy production from sludge. The tender focuses on a technically oriented, long-term collaboration with a supplier experienced in green gas technology and CO2 gasification.

This General Request Specification (VSA) describes the required Works for the Green Gas and CO2 gasification plant part, which connects to the capacity increase and renovation of AWZI Almere. The UAV-GC 2005 is explicitly applicable to this. The Works primarily consist of the design, drawing, calculation, manufacture, supply, transport, assembly, testing, commissioning, and the guaranteeing during the warranty period and the maintenance for 15 years of the plant described in this lot. These Works are summarized as follows: The realisation of green gas plants, fitting and completely functioni

45232420€ 8,29MWorks
1Realisation of a Green Gas Plant€8,294,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€8,294,000

04Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9569×
2Van Gelder BVSME9553×
3Heijmans Infra B.V.SME9565×
4Vissers Ploegmakers B.V.SME8919×
5Van Hattum & Blankevoort N.V.SME8919×
6De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME8626×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the works for the green gas and CO2 plant?
The works include the design, drawing, calculation, manufacture, supply, transport, assembly, testing, and commissioning of the green gas plant and the CO2 gasification plant.
What is the term for the maintenance of the plants?
After commissioning, the management and multi-year maintenance of both the green gas plant and the CO2 plant is required for a period of 15 years.
On which legal conditions is the contract based?
The UAV-GC 2005 is explicitly applicable to this contract.
What is the purpose of the plants to be realised at AWZI Almere?
The plants must connect to the capacity increase and renovation of AWZI Almere, whereby the green gas and CO2 plants must be compatible and fully functional with the sludge digestion plant to be newly realised.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 8,3 mln

Gegunde waarden in CPV 45 · werken n=3159