Realisation of a Biogas Plant
Realisation of a biogas and CO2 plant for AWZI Almere; design, construction, installation, 15-year maintenance; fully in accordance with UAV-GC 2005.
Works · Open · European procedure
01What is being requested
Realisation of a biogas and CO2 plant for AWZI Almere; design, construction, installation, 15-year maintenance; fully in accordance with UAV-GC 2005.
This General Requirements Specification (VSA) describes the required Works for the biogas and CO2 recovery plant part, which connects to the capacity increase and renovation of AWZI Almere. The UAV-GC 2005 is explicitly applicable hereto. It is the primary scope of the Works to design, draw, calculate, manufacture, deliver, transport, assemble, test, deliver ready for use, and to guarantee during the warranty period and maintain for 15 years the plant described in this lot. These Works are summarized as follows: The realisation of biogas plants, fitting and completely functioning with the sl
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What does the assignment for the realisation of the plants entail?
Which specific plants are being realised within this assignment?
What is the scope of the maintenance after realisation?
On which general terms and conditions is the execution based?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159