Realization of a biomethane and CO2 liquefaction plant
The tender by Waterschap Zuiderzeeland concerns the realization of a biomethane and CO2 liquefaction plant that connects to the capacity expansion and renovation of AWZI Almere. The works include design, calculation, fabrication, delivery, installation, testing, commissioning, warranty, and 15 years of maintenance. The UAV-GC 2005 is applicable. The contracting authority requires a fully functioning plant that is integrated with the new sludge digestion plant, including management and multi-year maintenance for both systems.
Works · Open · European procedure
01What is being requested
The tender by Waterschap Zuiderzeeland concerns the realization of a biomethane and CO2 liquefaction plant that connects to the capacity expansion and renovation of AWZI Almere. The works include design, calculation, fabrication, delivery, installation, testing, commissioning, warranty, and 15 years of maintenance. The UAV-GC 2005 is applicable. The contracting authority requires a fully functioning plant that is integrated with the new sludge digestion plant, including management and multi-year maintenance for both systems.
This General Request Specification (VSA) describes the required Works for the biomethane and CO2 liquefaction plant part, which connects to the capacity expansion and renovation of AWZI Almere. The UAV-GC 2005 is explicitly applicable to this. The Works primarily consist of the design, drawing, calculation, manufacturing, delivery, supply, assembly, testing, commissioning, and the guaranteeing during the warranty period and the maintenance for 15 years of the plant described in this lot. These Works are summarized as follows: Realizing a biomethane plant, fitting and completely functioning w
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the works for the biomethane and CO2 plant?
What maintenance period applies to the plants?
Which legal conditions apply to this assignment?
What is the focus of the liquefaction plant?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln