Realization of Turnhall (D&B)
The Municipality of Tilburg is looking for a party for the realization of a multifunctional gymnastics hall of approximately 2,900 m2 GFA in the Stappegoor district. The contract will be awarded based on the best price-quality ratio, where the weighting lies entirely on quality.
Works · Restricted · European procedure
01What is being requested
Realization of a gymnastics facility in the Stappegoor district with a surface area of approximately 2,900 m2 GFA, including a movement box, sanitary facilities, toddler care, BSO-sport, storage areas, and catering service corner within a duration of 24 months.
The Municipality of Tilburg intends to realize a gymnastics facility in the Stappegoor district, near T-Kwadraat and the Pathé cinema. This gymnastics facility with a surface area of approximately 2,900 square meters gross floor area is to be realized in a ground-based building in which, in addition to this gymnastics facility, the following facilities must also be realized indoors: • A movement box; • Sanitary facilities; • A toddler care (2-4 years) and after-school care (BSO-sport) with its own outdoor space; • Storage areas for Sportbedrijf Tilburg and ROC Sport en Bewegen; • A catering s
02Outcome
van der Horst bouw en onderhoud B.V.
03Strategic insight
During the selection phase, focus entirely on demonstrating the core competencies through relevant reference projects. Ensure that the reference projects meet the specific requirements for multifunctional design and integrated project management. Given the weighting, the quality of the design and sustainability is decisive for the award.
04Points of attention
05Can I take part?
06Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
07Award criteria
Assessment of the design and functionality.
Assessment of sustainability and quality.
Assessment of architectural, urban planning and spatial quality.
The bid must comply with realization for the fixed lump sum between € 9 million and € 9.5 million excl. VAT.
08Process & timeline
09Value in context
10Bidders in this segment
11Tender documents
12Legal themes that may be relevant here
13Frequently asked questions
What is the scope of the gymnastics facility to be realized?
Which facilities must be realized in the building?
What specific experience requirements must a candidate meet?
Automatically compiled from the official tender data and documents.
14Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159