Realization of drum screens RWZI Scheemda

Waterschap Hunze en Aa's · Onderhandeling zonder bekendmaking · 1 lots · 345184
Type
Works
45232421
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This project concerns the replacement of the grit removal installations at RWZI Scheemda by Waterschap Hunze en Aa's, carried out via a negotiated procedure without publication. The procurement was closed due to a calamity that led to inefficient contamination and increased maintenance costs. A construction team agreement with the chosen market party (contractor) is the contract form.

Works · Onderhandeling zonder bekendmaking · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

This project concerns the replacement of the grit removal installations at RWZI Scheemda by Waterschap Hunze en Aa's, carried out via a negotiated procedure without publication. The procurement was closed due to a calamity that led to inefficient contamination and increased maintenance costs. A construction team agreement with the chosen market party (contractor) is the contract form.

The board of Waterschap Hunze en Aa's has released execution credit to replace the grit removal installations of RWZI Scheemda. Due to a calamity (both existing screens have failed), the intended project-based approach has been accelerated. The defect of the existing screens means that the sewage entering the RWZI is not cleared of coarse debris. This debris enters the subsequent installation components. It is possible that the debris is partially discharged into surface water with the effluent water. The debris causes a less efficient purification process, leads to accumulations in the purif

45232421Works
1Realization of drum screens RWZI Scheemda

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9692×
2BAM Infra B.V.SME9677×
3Heijmans Infra B.V.SME9665×
4ENGIE Infra & Mobility B.V.SME9569×
5Dura Vermeer Infra Regionale Projecten BVSME9558×
6Croonwolter&dros B.V.SME9226×

05Legal themes that may be relevant here

06Frequently asked questions

What is the reason for the accelerated approach to the replacement of the grit removal installations?
Due to a calamity in which both existing screens became defective, the approach has been accelerated. The defect ensures that sewage is not cleared of coarse debris, which leads to inefficient purification, blockages, wear to machinery, and the risk that discharge standards for nitrogen, phosphate, and coarse particles are not met.
Which contract form is used for the realization of the drum screens?
A construction team agreement is being used. During the construction team phase, the execution plan is elaborated in detail with a cost specification. The contractor then has the right to be the first to submit a tender for the realization phase, which is agreed upon based on a cost specification approved by the contracting authority and in accordance with market conditions.
What is the intended operational date of the new installation?
It is expected that the new installation will be operational before 1 February 2025.
What risks are associated with the use of the current temporary installation?
The temporary installation has a lower capacity, no reserve setting, and a larger screen size than desired. Additionally, there are possible negative Arbo-technical consequences, such as exposure to biological agents and a non-ideal workplace at height.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159