AwardedWorksEuropeanCompetitive dialogueGreen

Realization Schakelcollege

Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

This tender concerns a competitive dialogue for the engineering, construction, and maintenance of a new school building for the Schakelcollege in Tilburg.

Works · Competitive dialogue · European procedure

Sustainability countsEuropeanComplete timeline
Contract type
Works
Competitive dialogue
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPEBMcompetitive dialogueschakelcollege

01What is being requested

Realization of the new construction of the Schakelcollege, consisting of the engineering, realization, and maintenance of a building of approximately 3,500 m2 GFA at Reitse Hoevenstraat in Tilburg.

An EBM contractor will, according to the requirements specifications at Preliminary Design+ level, provide the engineering, realization, and maintenance of the new construction of the Schakelcollege (approximately 3,500 m2) at Reitse Hoevenstraat 20 in Tilburg. For this assignment, there is a need for a collaborative form suitable for the client profile, through which the objectives and the desired result of the project are achieved in a controlled manner with as few errors, failure costs, and delays as possible. The reasons for applying an EBM collaborative form are:• Best ratio between Quali

45000000Works
1Realization Schakelcollege

02Strategic insight

Strategic insight · AI analysis
Ensure that the reference projects comply exactly with the requirements for integrated contracts and the minimum contract value. Check whether all certificates such as ISO 9001 and VCA are still valid and fall within the specified terms. Submit all UEA documents legally signed by the correct authorized persons.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
Requests for participation may not contain reservations.Important
When participating in a combination, one lead party must be designated.Important
If subcontractors are used for suitability requirements, they must also submit a UEA.Important
Evidence such as the GVA and the Tax Administration statement must be requested in a timely manner.Important

04Can I take part?

Financial · 1
Employer's liability insurance with a minimum coverage of € 2,500,000 per year or € 1,250,000 per event.Financial
Technical · 3
Certified quality management system based on NEN-EN-ISO:9001.Technical
Certified VGM system (VCA** or equivalent).Technical
One reference project for a utility building under an integrated contract (UAV-GC or equivalent), including responsibility for engineering from PD level, with a minimum contract value of € 3,000,000 (excl. VAT) and completed no later than 5 years before application.Technical

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Process & timeline

Publication of announcement
30 april 2024
Deadline for submitting questions
21 mei 2024
Publication of Note of Information
28 mei 2024
Closing date for receipt of requests to participate
20 juni 2024
Dispatch of selection decision ranking
27 juni 2024
Requesting and submitting evidence
3 juli 2024
Start of tender phase
15 augustus 2024

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Bidders in this segment

#Likely bidderFitWins
1BINX Smartility B.V.SME9927×
2BAM Bouw en Techniek bvSME9734×
3Hegeman Bouw & Infra B.V.SME9531×
4Combinatie Heijmans - SWARCOUnknown9573×
5Heijmans Utiliteit B.V.SME9527×
6BAM Infra B.V.SME9577×

09Tender documents

TN465378 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250128151931pdfJan 29, 2025 · 9 KB
OGT Realisatie Schakelcollege NvI1 2024-05-28pdfMay 28, 2024 · 114 KB
realisatie vernieuwbouw Schakelcollege referentieformat 2024-04-30docxMay 2, 2024 · 39 KB
TN465378 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20240430163138pdfMay 2, 2024 · 11 KB
OGT Realisatie Schakelcollege UEA 2024-04-30pdfMay 2, 2024 · 2097 KB
177-02-023 Selectieleidraad OGT Schakelcollege 2024-04-30pdfMay 2, 2024 · 490 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the specific scope of the assignment for the EBM contractor?
The contractor provides the engineering, realization, and maintenance of the new construction of the Schakelcollege, with a size of approximately 3,500 m².
At which design level must the specifications be executed?
The assignment must be executed according to the requirements specifications at Preliminary Design+ level.
What are the main objectives of the chosen EBM collaborative form?
The collaborative form is aimed at the best ratio between quality and price, a single contractual point of contact for engineering, realization, and maintenance, efficiency, and the optimization of housing costs.
Which risks does the client aim to minimize with this contract form?
Through the EBM collaborative form, the aim is to achieve the objectives in a controlled manner with as few errors, failure costs, and delays as possible.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159