ClosedWorks

Realisation of recreational bicycle bridge Borgharen

Gemeente Maastricht · 1 lots · 373792
Type
Works
45221110
Estimated value
€ 3,40M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Maastricht has issued an open tender for the realisation of a recreational steel bicycle bridge between Maastricht and Borgharen in the Grensmaas. The contract is based on UAV-GC 2025 and focuses on design, engineering, and execution. Key challenges include the accessibility of the work location and working in the (border) Maas using temporary facilities. The publication is scheduled for week 23 2025, the award is expected in autumn 2025, and the planned realisation is for the low-water season Q2-Q3 2026.

Works · National procedure

Contracting authority
Contract type
Works
Estimated value
€3,400,000
estimated value
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The Municipality of Maastricht has issued an open tender for the realisation of a recreational steel bicycle bridge between Maastricht and Borgharen in the Grensmaas. The contract is based on UAV-GC 2025 and focuses on design, engineering, and execution. Key challenges include the accessibility of the work location and working in the (border) Maas using temporary facilities. The publication is scheduled for week 23 2025, the award is expected in autumn 2025, and the planned realisation is for the low-water season Q2-Q3 2026.

The Municipality of Maastricht intends to award a contract based on UAV-GC 2025 for the realisation of a bicycle bridge. Through this bicycle bridge, the Municipality of Maastricht aims to provide a recreational bicycle connection between Maastricht and Borgharen. The contract concerns the partial design, engineering, and realisation of a steel bicycle bridge in the Grensmaas at river kilometer 15.75, including the associated bicycle path on the banks. The primary challenges in the project are: 1. The accessibility of the work location; 2. Working in the (border) Maas by means of temporary fac

45221110€ 3,40MWorks
1Realisation of recreational bicycle bridge Borgharen€3,400,000

02Value in context

€3,400,000

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Combinatie Heijmans - SWARCOUnknown10073×
4Dura Vermeer Infra Regionale Projecten BVSME9958×
5Boskalis Nederland B.V.SME9869×
6Heijmans Infra B.V.SME9865×

04Legal themes that may be relevant here

05Frequently asked questions

What is the exact scope of the contract?
The contract includes the partial design, engineering, and realisation of a steel bicycle bridge in the Grensmaas at river kilometer 15.75, including the associated bicycle path on the banks.
Under what conditions will the contract be executed?
The realisation of the recreational bicycle bridge between Maastricht and Borgharen takes place on the basis of UAV-GC 2025.
What are the main technical challenges of this project?
The primary challenges are the accessibility of the work location and working in the (border) Maas through the use of temporary facilities.
When is the realisation of the bicycle bridge expected?
The realisation of the bicycle bridge is planned for the low-water season in the period of Q2-Q3 2026.
When is the final award anticipated?
The final award of the contract is anticipated in autumn 2025.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,4 mln

Gegunde waarden in CPV 45 · werken n=3159