Realization of modifications RWZI Arnhem-Zuid

Waterschap Rivierenland · Open · 1 lots · 317723
Type
Works
45252000
Estimated value
€ 20M
estimated
To deadline
-840d
Feb 28, 2024 · 12:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Rivierenland aims to future-proof the RWZI Arnhem-Zuid until 2035 through a series of modifications. The assignment comprises three work packages: (1) optimization of sludge thickening and dewatering, including heat exchange and adjustment of the (digested) sludge buffers; (2) realization of a new influent reception plant 2 and adjustment of the existing plant 1; (4) construction of a new green gas line. Delivery must be by 1 February 2026. The tender is open and aimed at a single bidder capable of performing all works. The contracting authority requires a structured approach, compliance with laws and regulations, and a design capable of handling the biological load until 2035. The assignment calls for an integrated solution that improves operational performance and ensures the availability of the plant.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€20,000,000
estimated value
Submission deadline
February 28, 2024
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPRWZI Arnhemsludgeinfluent reception plant

01What is being requested

Waterschap Rivierenland aims to future-proof the RWZI Arnhem-Zuid until 2035 through a series of modifications. The assignment comprises three work packages: (1) optimization of sludge thickening and dewatering, including heat exchange and adjustment of the (digested) sludge buffers; (2) realization of a new influent reception plant 2 and adjustment of the existing plant 1; (4) construction of a new green gas line. Delivery must be by 1 February 2026. The tender is open and aimed at a single bidder capable of performing all works. The contracting authority requires a structured approach, compliance with laws and regulations, and a design capable of handling the biological load until 2035. The assignment calls for an integrated solution that improves operational performance and ensures the availability of the plant.

The operational management of the RWZI Arnhem has been facing a large number of bottlenecks for several years. The performance and availability of the plant are falling below standards, and permanent compliance with laws and regulations is, under current circumstances, not possible.n/nBased on analyses, it has been determined that in 2035, the biological load will have increased by approximately 25% compared to the current design.n/nThe goal of the project ‘realization of modifications RWZI Arnhem’ is to future-proof the RWZI in a structured manner, so that it functions well again until at lea

45252000€ 20MWorks
1Realization of modifications RWZI Arnhem-Zuid€20,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€20,000,000

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9565×
2ENGIE Infra & Mobility B.V.SME9569×
3Van Hattum & Blankevoort N.V.SME9319×
4Den Ouden Aannemingsbedrijf B.V.SME9123×
5Van Oord Nederland BVSME9019×
6Croonwolter&dros B.V.SME8925×

05Legal themes that may be relevant here

06Frequently asked questions

Which work packages does the assignment consist of?
The assignment is divided into three work packages: (1) the sludge line with modifications to thickening, dewatering, heat exchange, and sludge buffers; (2) the influent reception plant with the realization of a new plant 2 and adjustment of plant 1; and (4) the realization of a new green gas line.
What is the intended delivery date of the works?
The full realization of the modifications to the RWZI Arnhem-Zuid must be delivered no later than 1 February 2026.
Which aspects of the plant are focused on during the modifications?
The modifications focus on improving operational performance and ensuring the availability of the plant, so that operations can again comply with the applicable laws and regulations.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 20 mln

Gegunde waarden in CPV 45 · werken n=3159