Realisation of Climate-Resilient Beekdal Sint-Oedenrode
This project by Waterschap De Dommel focuses on implementing climate-resilient measures in the Beekdal of Sint-Oedenrode. The objective is to protect the built-up area from flooding caused by surface water and to design the area surrounding the Dommel to be climate-resilient. At selected locations, winterbeds up to 25 meters wide will be constructed, combined with recreational facilities for the municipality. Additionally, an ecological connection zone will be realized along the Dommel, which extends through the built-up area, thereby strengthening natural connections. The specification includes the design, construction, installation, and maintenance of the winterbeds, recreational and ecological facilities, including water management solutions and safety measures. The procedure is non-public, allowing a limited number of certified contractors to participate. The assignment requires expertise in water and infrastructure, climate adaptation, ecology, and recreational planning, with a strong focus on sustainability and integration with existing water management infrastructure.
Works · Restricted · European procedure
01What is being requested
This project by Waterschap De Dommel focuses on implementing climate-resilient measures in the Beekdal of Sint-Oedenrode. The objective is to protect the built-up area from flooding caused by surface water and to design the area surrounding the Dommel to be climate-resilient. At selected locations, winterbeds up to 25 meters wide will be constructed, combined with recreational facilities for the municipality. Additionally, an ecological connection zone will be realized along the Dommel, which extends through the built-up area, thereby strengthening natural connections. The specification includes the design, construction, installation, and maintenance of the winterbeds, recreational and ecological facilities, including water management solutions and safety measures. The procedure is non-public, allowing a limited number of certified contractors to participate. The assignment requires expertise in water and infrastructure, climate adaptation, ecology, and recreational planning, with a strong focus on sustainability and integration with existing water management infrastructure.
The specification for the realisation of Klimaatrobuust Beekdal Sint-Oedenrode is aimed at implementing measures to protect the built-up area of Sint-Oedenrode against flooding from surface water and the climate-resilient design of the area surrounding the Dommel. In certain locations, a winterbed up to 25 meters wide will be constructed for this purpose. The plan also includes recreational measures and facilities for the municipality, as well as an ecological connection zone along the Dommel through the built-up area of Sint-Oedenrode. See attachment.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
Which physical measures will be implemented in the valley?
What is the scope of the specification?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159