ClosedWorksOpen

Realization of 3 bridges Oude Hockeyvelden

Gemeente Hoorn · Open · 1 lots · 354127
Type
Works
45221100
Estimated value
€ 540K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Hoorn is requesting a contractor to realize three bridges at the Oude Hockeyvelden construction site. The ground level is at NAP -0.54 m with an average groundwater level of NAP -2.2 m, making underground work and waterproofing measures necessary. The bridges must comply with Dutch construction and safety standards, must be accessible via a municipal construction road, and must be delivered within the specified term and available budget. The contract is public and requires a transparent procurement procedure. The contractor must have experience with structures in wet soils, waterproofing systems, and working on a construction site with limited access.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€540,000
estimated value
Submission deadline
Ongoing
09:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksbridgesOude HockeyveldenHoorn

01What is being requested

The Municipality of Hoorn is requesting a contractor to realize three bridges at the Oude Hockeyvelden construction site. The ground level is at NAP -0.54 m with an average groundwater level of NAP -2.2 m, making underground work and waterproofing measures necessary. The bridges must comply with Dutch construction and safety standards, must be accessible via a municipal construction road, and must be delivered within the specified term and available budget. The contract is public and requires a transparent procurement procedure. The contractor must have experience with structures in wet soils, waterproofing systems, and working on a construction site with limited access.

The 3 bridges will be constructed at the construction site of the Oude Hockey velden location in Hoorn. The ground level is at an elevation of NAP -0.54 m. You can assume an average groundwater level of NAP -2.2. The site is accessible from the public road via a construction road constructed and maintained by the municipality.

45221100€ 540KWorks
1Realization of 3 bridges Oude Hockeyvelden€540,000

02Value in context

€540,000

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9792×
2Dura Vermeer Infra Regionale Projecten BVSME9758×
3BAM Infra B.V.SME9577×
4Heijmans Infra B.V.SME9565×
5Combinatie Heijmans - SWARCOUnknown9473×
6Boskalis Nederland B.V.SME9469×

04Legal themes that may be relevant here

05Frequently asked questions

What are the specific environmental factors at the construction site?
The ground level at the Oude Hockeyvelden location is at NAP -0.54 m with an average groundwater level of NAP -2.2 m.
How is the accessibility of the construction site arranged?
The site is accessible from the public road via a construction road constructed and maintained by the municipality.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 540K

Gegunde waarden in CPV 45 · werken n=3159