RAW Framework Agreement, maintenance of paving elements 2025-2027

Gemeente Eemsdelta · Open · 1 lots · 369611
Type
Works
45230000
Estimated value
€ 3,00M
estimated
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

Framework agreement for the maintenance of paving elements in the Municipality of Eemsdelta with an expected turnover of € 3 million over four years.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€3,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The assignment concerns a framework agreement for the removal and re-installation of paving elements and additional works in the Municipality of Eemsdelta for a period of two years with possible extension.

The framework agreement largely contains the following works:n Carrying out removal works (sawing, breaking up and removing asphalt pavements);n Breaking up, removing and disposing of curb restraints and paving elements in various formats;n Carrying out earthworks (excavating, transporting, removing, processing, compacting and supplying soil);n Carrying out sewerage works (removing, supplying, installing, relocating and (re)setting manhole covers, street and sidewalk gullies and sewer pipes);n Supplying and installing foundation material;n Supplying and installing paving elements and cur

45230000€ 3,00MWorks
1maintenance of paving elements 2025-2027€3,000,000

02Outcome

Awarded

Beugel Infrastructuur B.V.

Bidders
4

03Strategic insight

Strategic insight · AI analysis
Ensure an accurate price proposal based on the correct specification items and execution method. Take into account the obligation to draw up a work plan per individual assignment, including traffic and communication plans. Be prepared for the maintenance period of 6 months per individual assignment.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
The contractor must submit a bid within 15 working days after designation.Important
A detailed work plan must be submitted within 7 working days after the order.Important
Execution only begins after approval of the detailed work plan.Important
No discount or one-off costs may be included in the tender state.Important

05Can I take part?

Technical — Certified safety management system based on VCA*.
Financial — Comprehensive liability insurance for companies with a coverage of at least € 5,000,000.00 per event.

06Value in context

€3,000,000

07Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Heijmans Infra B.V.SME10065×
4Dura Vermeer Infra Regionale Projecten BVSME10058×
5D. van der Steen B.V.SME10031×
6Combinatie Heijmans - SWARCOUnknown9973×

08Tender documents

TN511619 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250603113522pdfJun 3, 2025 · 10 KB
nota van inlichtingen bestek 30-2024 ROVK Eemsdelta_25-03-2025pdfMar 25, 2025 · 50 KB
Deel A - Beschrijvend document ROVK elementenverhardingen v1.0pdfMar 3, 2025 · 1116 KB
TN511619 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250303181910pdfMar 3, 2025 · 9 KB
Bijlage 7 - Deel C Communicatie en werkwijze indiening inschrijvingpdfMar 3, 2025 · 786 KB
def bestek 30-2024 ROVK Eemsdelta 2025-03-03rsxMar 3, 2025 · 1979 KB
Bijlage 6 - Deel B Aanbestedingsvoorwaarden ROVK elementenverhardingenpdfMar 3, 2025 · 827 KB
Bijlage 2 model KpdfMar 3, 2025 · 444 KB
def bestek 30-2024 ROVK Eemsdelta 2025-03-03pdfMar 3, 2025 · 1377 KB
uea_511619_20250303174842pdfMar 3, 2025 · 1587 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the duration of the framework agreement?
The agreement is entered into for a period of two years (May 2025 to April 2026 and May 2026 to April 2027), with a possible extension of two times 1 year.
Which works fall under this framework agreement?
The works include, among others, removal works (sawing, breaking up and removing asphalt), the removal of curb restraints and paving elements, earthworks, sewerage and foundation works, the supply of traffic measures and additional works.
How is the procedure for individual assignments handled?
The contracting authority designates the work including the content and preconditions. The contractor then prepares a bid based on a working drawing (including work area, location via DTM and adjacent plots) and a price proposal.
What terms apply to the maintenance period and discounts?
The maintenance period for each individual assignment is 6 months. For each partial delivery, the discount, as referred to in paragraph 42, paragraph 2, of the UAV 2012, is 0.5% of the contract sum per day.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,0 mln

Gegunde waarden in CPV 45 · werken n=3159