AwardedWorksOpen

Framework agreement relining 2025-2031 Municipality of Arnhem

Gemeente Arnhem · Open · 1 lots · 364871
Type
Works
45232400
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This tender concerns a framework agreement for relining works by the Municipality of Arnhem until 2031. Bidders must demonstrate sufficient technical experience and have no Russian involvement.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The contract concerns a framework agreement for the relining of sewer systems for the Municipality of Arnhem in the period 2025-2031.

Framework agreement relining 2025-2032 Municipality of Arnhem

45232400Works
1Framework agreement relining 2025-2031 Municipality of Arnhem

02Outcome

Awarded

GMB Leidingtechnieken B.V.

Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure a conclusive declaration regarding the absence of Russian interests within the organization and the consortium. Check whether the submitted reference projects exactly meet the requirement of 1,000 m1 over a period of two years. When submitting references, also offer the possibility of providing a satisfaction statement.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 3
A declaration must be made regarding the absence of Russian involvement.Important
Subcontractors or suppliers identified as Russian entities may not account for more than 10% of the contract value.Important
For the suitability requirement, a satisfaction statement must be able to be provided upon request.Important

05Can I take part?

Technical — The performance of relining, by means of CIPP/sleeve method, of at least 1,000 m1 of sewer systems during a period of two (2) years, within a RAW framework agreement.

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Bidders in this segment

#Likely bidderFitWins
1D. van der Steen B.V.SME9731×
2BAM Infra B.V.SME9677×
3KWS Infra B.V.SME9592×
4Combinatie Heijmans - SWARCOUnknown9573×
5Heijmans Infra B.V.SME9565×
6Dura Vermeer Infra Regionale Projecten BVSME9458×

08Tender documents

TN502588 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250424102926pdfApr 24, 2025 · 8 KB
2e NVI_ROK RelinenzipMar 4, 2025 · 382 KB
NVI_ROK RelinenzipFeb 19, 2025 · 300 KB
Bijlage 1_ vragen NvIdocxJan 23, 2025 · 90 KB
18-2024 Raamovereenkomst relinen 2025-2031 v1.0zipJan 23, 2025 · 5252 KB
uea_502588_20241216111150pdfJan 23, 2025 · 1532 KB
Bijlage 3_Verklaring Beroep op Derden (2)docxJan 23, 2025 · 27 KB
Aanbestedingsleidraad_ROK relinen 2025-2031 gemeente Arnhem (2)pdfJan 23, 2025 · 547 KB
Bijlage - Arnhems Routekaart SEB 2024pdfJan 23, 2025 · 1216 KB
Bijlage A_tool prestatiemetingxlsxJan 23, 2025 · 23 KB
Bijlage 5_Inschrijvingsformulier Referentieprojecten Geschiktheidseisen (2)docJan 23, 2025 · 74 KB
Bijlage C_ inschrijfformulier schoon emissieloos bouwen (SEB) (3)xlsxJan 23, 2025 · 57 KB

09Legal themes that may be relevant here

10Frequently asked questions

What are the main activities within this framework agreement?
The activities mainly consist of sealing sewer lines, cleaning and inspecting sewer pipes, clearing obstructions in sewer pipes, and relining sewer lines using the sleeve method (CIPP).
Which criteria are applied during the execution of sub-contracts?
Performance is assessed on preparation (30%), execution (40%), and delivery (30%). During execution, specific attention is paid to traffic measures in accordance with the traffic plan, communication in accordance with the communication plan, the quality of test sections, and the absence of visual deviations in the liner.
What requirements must the quality of the liner meet?
The liner must sit flat and tight against the pipe wall over its entire circumference and length. Folds are only permitted at corner turns, radial displacements, or diameter changes. Deformation due to imperfections may not be greater than 2% of the radius, and deformation due to obstructions is not permitted.
What are the terms for submitting sub-contracts?
The term for submitting a sub-contract is 4 weeks for sub-contracts less than or equal to € 50,000, and 6 weeks for sub-contracts greater than € 50,000.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159