AwardedServicesEuropeanOpen

Framework agreement cleaning and inspection of sewerage 2025-2028

Gemeente Tynaarlo · Open · 1 lots · 376330
Type
Services
90470000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

Framework agreement for the cleaning and inspecting of sewerage and drainage in the municipality of Tynaarlo with a total scope of approximately 41.5 km.

Services · Open · European procedure

EuropeanComplete timeline
Contracting authority
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 90ServicesEU tender

01What is being requested

The assignment concerns the cleaning and inspection of approximately 41.5 km of sewerage and drainage in the municipality of Tynaarlo during an initial period of 1.5 years with two extension options.

The assignment comprises the cleaning and inspecting of gravity sewerage and drainage in the municipality of Tynaarlo, consisting of;denotes list items:

90470000Services
1Cleaning and inspection of sewerage

02Strategic insight

Strategic insight · AI analysis
When pricing, focus on the lowest price as this is the only award criterion. Ensure a conclusive Social Return strategy in accordance with the building block method to prevent sanctions. Take the extension options of two times one year into account in the calculation.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 4
The contractor is responsible for the Social Return accountability when using subcontractors.Important
Social Return must not lead to the displacement of regular jobs.Important
The full accountability must be entered no later than one month after the end of the agreement.Important
A sanction may be imposed if the Social Return obligation is not fully realized.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Award criteria

Lowest price100

The assignment is awarded on the basis of the lowest price.

06Process & timeline

Requests for additional information
22/05/2025 09:00 +02:00
Tender deadline
13/06/2025 09:00 +02:00
Opening
13/06/2025 09:15 +02:00
Start of initial term
12/07/2025
End of initial term
31/12/2026

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Bidders in this segment

#Likely bidderFitWins
1Vandervalk+degroot B.V.SME10066×
2vandervalk+degroot bvSME10037×
3PreZero Riool Services B.V.SME10022×
4Veeg- en Rioolbedrijf Adriaans BVSME10025×
5REMONDIS Smart Infra B.V.SME9929×
6AsitoUnknown9668×

09Tender documents

TN519414 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250714112830pdfJul 15, 2025 · 9 KB
Bijlage 3 UAV-2012pdfApr 25, 2025 · 3166 KB
Bijlage 1 Bestek inclusief bijlagenzipApr 25, 2025 · 2080 KB
uea_519414_20250417111850pdfApr 25, 2025 · 330 KB
Bijlage 2 Concept overeenkomstpdfApr 25, 2025 · 930 KB
Bijlage 4 Uitvoering Social Return 3.0 - 2025 (AMRG)pdfApr 25, 2025 · 325 KB
TN519414 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250424085115pdfApr 25, 2025 · 8 KB
Bijlage 6 ReferentieverklaringdocxApr 25, 2025 · 22 KB
Aanbestedingsdocument reiniging en inspectie rioleringpdfApr 25, 2025 · 1378 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the exact scope of the works for the sewerage and drainage?
The total scope is approximately 41.5 km, divided into approximately 29.5 km DWA, 10.5 km RWA and 1.5 km drainage that must be cleaned and inspected.
Which specific works are part of the assignment?
The assignment includes the application of temporary shut-offs, the cleaning of sewerage and drainage, the inspection of sewerage, the application of temporary traffic measures and facilities, and the removal and disposal of sludge.
How is the Social Return obligation implemented?
Social Return is implemented via the building block method in the labor market region Drenthe, Friesland and Groningen, whereby monitoring takes place via the Social Return Monitor.
Which target groups can be deployed for the Social Return implementation?
Possible target groups include, among others, people from the Participation Act (€ 45,000 over 2 years), the Jobs Agreement (€ 55,000), WW (€ 22,500 over 2 years), WIA/WAO (€ 45,000) and MBO students.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 214K
median
€ 466K
p75
€ 1,2 mln
deze opdracht

Gegunde waarden in CPV 90 · diensten n=2216