Closed

Framework Agreement Bank Protection Structures

Gemeente Waterland · 1 lots · 407431
Type
45246200
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Waterland is seeking suppliers for the design, calculation, and realization of bank protection structures within a framework agreement. The assignment concerns civil engineering works within the municipal area and includes various phases, from technical design to construction. No specific lots or deadlines are mentioned, but the non-public procedure suggests a restricted call for tenders. This is attractive to SMEs with experience in civil structures, as there are no large turnover requirements or complex contract terms.

Contract · National procedure

Contracting authority
Contract type
Not specified
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45bank protection structuresframework agreementcivil engineering

01What is being requested

The Municipality of Waterland is seeking suppliers for the design, calculation, and realization of bank protection structures within a framework agreement. The assignment concerns civil engineering works within the municipal area and includes various phases, from technical design to construction. No specific lots or deadlines are mentioned, but the non-public procedure suggests a restricted call for tenders. This is attractive to SMEs with experience in civil structures, as there are no large turnover requirements or complex contract terms.

The Realization department manages the assets of the Municipality of Waterland, which (broadly) includes, among others, road infrastructure, sewerage works, grounds maintenance, civil engineering works, public lighting, water management, traffic facilities, and social real estate. The requested products and services recur in various forms of cooperation and different project phases. This includes activities such as the design of the bank protection structures, the drafting of further agreements, the performance of technical and structural calculations, and the execution of the bank protection

45246200
1Framework Agreement Bank Protection Structures

02Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2BAM Infra B.V.SME9977×
3Arcadis Nederland B.V.SME98116×
4Haskoning Nederland B.V.SME98100×
5Witteveen+Bos Raadgevende ingenieurs B.V.SME9863×
6Sweco Nederland B.V. SME9871×

03Tender documents

uea_559929_20260107141315pdfJan 8, 2026 · 351 KB
TN559929 - EFE3 Vrijwillige aankondiging van een opdracht 20260108105133pdfJan 8, 2026 · 144 KB
Bijlage 1 Format referentie-opdracht bij NvIdocxJan 6, 2026 · 29 KB
Nota van inlichtingen 2026-01-06-1pdfJan 6, 2026 · 12 KB
Wijzigingen Inschrijvingsleidraad V4.0 tov V3.0pdfJan 6, 2026 · 540 KB
Inschrijvingsleidraad raamovereenkomst oeverconstructies V4.0pdfJan 6, 2026 · 512 KB
Bijlage 2 Concept raamovereenkomstpdfDec 3, 2025 · 254 KB
Bijlage 8 Polis CAR verzekeringpdfDec 3, 2025 · 406 KB
Bijlage 7 Overzicht verkeersbeperkingen gemeente WaterlandpdfDec 3, 2025 · 92 KB
Inschrijvingsleidraad raamovereenkomst oeverconstructies V3.0pdfDec 3, 2025 · 685 KB
Bijlage 9 Uitvoeringsprotocol Social Return Zaanstreek-WaterlandpdfDec 3, 2025 · 2046 KB
Bijlage 3C Tekening P250234_CBE_402_4.0pdfDec 3, 2025 · 348 KB

04Legal themes that may be relevant here

05Frequently asked questions

What is the scope of the work within this framework agreement?
The assignment includes various phases, including the design of bank protection structures, the performance of technical and structural calculations, and the final realization of the bank protection structures.
Which activities are carried out by the Realization department?
The Realization department manages the municipality's assets, including road infrastructure, sewerage works, grounds maintenance, civil engineering works, public lighting, water management, traffic facilities, and social real estate.
In what manner are the services within the agreement delivered?
The requested products and services recur in different forms of cooperation and various project phases, ranging from technical design to the execution of the structures.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 n=3179