ClosedWorksEuropeanRestrictedGreen

Framework agreement Integrated implementation programme for maintenance and replacements of Roads, Civil Structures and Water Chain 2024 - 2027 Municipality of Het Hogeland

gemeente Het Hogeland · Restricted · 1 lots · 334418
Type
Works
45000000
Estimated value
€ 43M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Het Hogeland is seeking a single party to plan and execute the integrated implementation programme for the maintenance and replacement of roads, civil structures, and the water chain. The contract covers the period 2024-2027 and includes both preparatory works (planning, design, permits) and the actual execution (maintenance, replacement, repair). The tender is restricted, meaning the municipality is approaching a limited number of candidates. The contracting authority expects an integrated approach in which various disciplines (road, civil engineering, water management) connect seamlessly, with attention to sustainability, safety, and cost control. The party must possess experience with large-scale infrastructure projects, knowledge of local laws and regulations, and a proven track record in delivering timely, high-quality works.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€43,000,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPProad maintenancecivil structureswater chain

01What is being requested

The Municipality of Het Hogeland is seeking a single party to plan and execute the integrated implementation programme for the maintenance and replacement of roads, civil structures, and the water chain. The contract covers the period 2024-2027 and includes both preparatory works (planning, design, permits) and the actual execution (maintenance, replacement, repair). The tender is restricted, meaning the municipality is approaching a limited number of candidates. The contracting authority expects an integrated approach in which various disciplines (road, civil engineering, water management) connect seamlessly, with attention to sustainability, safety, and cost control. The party must possess experience with large-scale infrastructure projects, knowledge of local laws and regulations, and a proven track record in delivering timely, high-quality works.

The objective of the tender is to contract a single party for the preparation and execution of the integrated implementation programme for maintenance and replacements of Roads, Civil Structures and Water Chain for the Municipality of Het Hogeland.

45000000€ 43MWorks
1Framework agreement Integrated implementation programme for maintenance and replacements of Roads, Civil Structures and Water Chain 2024 - 2027 Municipality of Het Hogeland€43,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€43,000,000

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2BAM Infra B.V.SME9877×
3Van Gelder BVSME9853×
4Combinatie Heijmans - SWARCOUnknown9773×
5Heijmans Infra B.V.SME9665×
6Boskalis Nederland B.V.SME9669×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of this framework agreement?
The objective is to contract a single party for the preparation and execution of the integrated implementation programme for maintenance and replacement of roads, civil structures and the water chain for the Municipality of Het Hogeland.
Which works are included in the assignment?
The assignment includes both preparatory works, such as planning, design and permits, as well as the actual execution of maintenance, replacement and repair of roads, civil structures and the water chain.
For which period is the agreement intended?
The framework agreement for the integrated implementation programme has a duration in the period 2024 - 2027.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 43 mln

Gegunde waarden in CPV 45 · werken n=3159