Framework Agreement Major Road Maintenance 2026-2029

Gemeente Voerendaal · Open · 1 lots · 371954
Type
Works
45233222
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This tender concerns the execution of major maintenance to roads by the Municipality of Voerendaal during the years 2026 to 2029 inclusive.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The assignment concerns a framework agreement for the major maintenance of roads in the Municipality of Voerendaal for the period 2026-2029.

The work mainly consists of: a. Preparatory works b. Earthworks c. Breaking up and installing foundations d. Breaking up and installing paving elements and asphalt surfacing e. Breaking up and installing edge restraints f. Breaking up and installing gullies, gully connections and pit edges g. Resurfacing, repairing paving elements h. Application of surface treatments i. Breaking up and repairing overhangs j. Application of bituminous crack fillers k. Repairs (milling sections) in asphalt surfacing l. Application of road markings m. Construction of farm tracks n. Other additional

45233222Works
1Major Road Maintenance 2026-2029

02Outcome

Awarded

Heijmans Infra B.V.

Bidders
5

03Strategic insight

Strategic insight · AI analysis
Ensure accurate bill of quantities item control given the many expired and replaced items. Pay specific attention to the material requirements such as the specific load classes and mix properties. Take into account the processing conditions for asphalt and the obligation to provide certificates.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 3
The removal of excess stone chippings must take place within 5 working days.Important
The acceptance costs for released materials are for the account of the contractor.Important
For certain asphalt layers, a CE processing sheet must be submitted to the contracting authority for approval.Important

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Combinatie Heijmans - SWARCOUnknown10073×
3Van Gelder BVSME10053×
4D. van der Steen B.V.SME10031×
5Dura Vermeer Infra Regionale Projecten BVSME9958×
6De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9926×

07Tender documents

TN517873 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250811083716pdfAug 11, 2025 · 9 KB
24366.1 IsN 01-0 ssirsxApr 9, 2025 · 1039 KB
24366.1 NvI 01-0 ssipdfApr 9, 2025 · 405 KB
24366.1 NvI 01-0 ssinsxApr 9, 2025 · 337 KB
24366.1 Vraag en antwoord 01-A rvepdfApr 9, 2025 · 39 KB
24366.1 RO 01-C ssirsxMar 25, 2025 · 1030 KB
24366.1 ROzipMar 24, 2025 · 2249 KB
uea_517873_20250324100353pdfMar 24, 2025 · 1530 KB
TN517873 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250324103506pdfMar 24, 2025 · 8 KB

08Legal themes that may be relevant here

09Frequently asked questions

What does the scope of the works for the major maintenance of roads entail?
The works include, among other things, preparatory works, earthworks, the installation of foundations, paving elements and asphalt surfacing, edge restraints, gullies, repair of overhangs, bituminous crack fillers, road markings and the construction of farm tracks.
Which specifications apply to the delivery of concrete tiles within the agreement?
Concrete tiles of 300 x 300 x 45 mm are delivered with a load class in accordance with NEN-EN 1339:2003/C1:2006 in the color grey. Delivery takes place at the place of processing.
What type of finishing material is specified for the relevant bill of quantities item?
The finishing material to be delivered is specified as Grauwacke 8-16.
How much time should be allowed for an inspection or survey?
For an inspection or survey, 4 hours must be taken into account, excluding the required reporting.
What are the requirements regarding the engagement of subcontractors?
If the main contractor engages subcontractors, a 'subcontracting declaration' must be attached to the bid.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159