ClosedWorksOpen

Framework agreement major maintenance of cycle paths in the Oude Bosch in Bakkeveen specification 23-10-GB.

Provincie Fryslân · Open · 300898
Type
Works
45220000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Provincie Fryslân has a framework agreement for the major maintenance of 10.5 km of cycle paths in the Oude Bosch in Bakkeveen. The project includes the removal and disposal of existing asphalt paving, the construction of new concrete cycle paths, and additional works. The cycle paths are located in a sensitive nature reserve and are difficult to access, which entails additional logistical and environmental requirements. The available budget of approximately € 950,000 (incl. VAT) is insufficient to carry out all planned replacements; therefore, a framework agreement with fictitious quantities has been chosen, so that additional budget can be found after the award. The assignment requires precise planning, environmentally friendly disposal, and the ability to respond flexibly to budget changes.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Workscycle pathsasphalt pavingconcrete

01What is being requested

The Provincie Fryslân has a framework agreement for the major maintenance of 10.5 km of cycle paths in the Oude Bosch in Bakkeveen. The project includes the removal and disposal of existing asphalt paving, the construction of new concrete cycle paths, and additional works. The cycle paths are located in a sensitive nature reserve and are difficult to access, which entails additional logistical and environmental requirements. The available budget of approximately € 950,000 (incl. VAT) is insufficient to carry out all planned replacements; therefore, a framework agreement with fictitious quantities has been chosen, so that additional budget can be found after the award. The assignment requires precise planning, environmentally friendly disposal, and the ability to respond flexibly to budget changes.

The project concerns: the removal and disposal of existing asphalt cycle paths, the application of concrete cycle paths, and the execution of additional works. The cycle paths are mostly located in a sensitive nature reserve and are not easily accessible. Approximately 10.5 km of cycle path is eligible for the replacement of the asphalt paving. The available budget of approximately (€ 950,000, incl. VAT) is not expected by the contracting authority to be sufficient to replace the paving of all eligible cycle paths. In order to replace as many of the eligible cycle paths as possible, a framewor

45220000Works

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown9873×
2KWS Infra B.V.SME9692×
3BAM Infra B.V.SME9577×
4Dura Vermeer Infra Regionale Projecten BVSME9558×
5Boskalis Nederland B.V.SME9470×
6Van Gelder BVSME9453×

04Legal themes that may be relevant here

05Frequently asked questions

What is the specific scope of the works within this framework agreement?
The assignment concerns the removal and disposal of existing asphalt cycle paths and the application of new concrete cycle paths for approximately 10.5 km of cycle path.
Why was a framework agreement with fictitious quantities chosen?
The available budget of approximately € 950,000 (incl. VAT) is expected to be insufficient to replace all eligible cycle paths. By working with fictitious quantities, as much cycle path as possible can be replaced.
Are there specific logistical circumstances that must be taken into account?
The cycle paths are mostly located in a sensitive nature reserve and are not easily accessible, which influences the execution of the works.
Is there a possibility for expansion of the assignment after the award?
There is a possibility that additional budget will be found after the award to carry out the works.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159