AwardedWorksEuropeanCompetitive dialogue

Framework agreement Brightlands Circular Space

Chemelot Campus Vastgoed C.V. · Competitive dialogue · 1 lots · 295846
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Chemelot Campus Vastgoed C.V. intends to enter into a framework agreement for the engineering and execution of the construction of the Brightlands Circular Space (BCS) at the Brightlands Chemelot Campus in Sittard-Geleen. The BCS consists of preprocessing halls, material processing halls, and a mixed-use multitenant building, the Circular House, containing offices, laboratories, meeting rooms, and experience functions. The assignment falls under a programme structure and requires a market party capable of realizing both the cleanroom halls and the other construction projects. The procedure is a competitive dialogue, allowing multiple parties to be invited to present their concepts and solutions. The contracting authority expects an integrated approach, in which engineering, construction, project management, and quality control align seamlessly. The framework agreement must offer flexibility for future expansions within the BCS programme.

Works · Competitive dialogue · European procedure

European
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
Estimate not published
Submission deadline
Ongoing
15:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
GELEEN
CharacteristicsCPV 45WorksEU tenderBrightlands Circular Spacepreprocessing hallsmaterial processing halls

01What is being requested

Chemelot Campus Vastgoed C.V. intends to enter into a framework agreement for the engineering and execution of the construction of the Brightlands Circular Space (BCS) at the Brightlands Chemelot Campus in Sittard-Geleen. The BCS consists of preprocessing halls, material processing halls, and a mixed-use multitenant building, the Circular House, containing offices, laboratories, meeting rooms, and experience functions. The assignment falls under a programme structure and requires a market party capable of realizing both the cleanroom halls and the other construction projects. The procedure is a competitive dialogue, allowing multiple parties to be invited to present their concepts and solutions. The contracting authority expects an integrated approach, in which engineering, construction, project management, and quality control align seamlessly. The framework agreement must offer flexibility for future expansions within the BCS programme.

Chemelot Campus Vastgoed C.V. intends to expand on the north side of the Brightlands Chemelot Campus, located in Sittard-Geleen. The Brightlands Circular Space (also referred to as “BCS”) will be realized at this expansion site. [newline] The development and realization of Brightlands Circular Space is organized as a programme. Within this programme are the Preprocessing halls, Material processing halls, and a mixed-use multitenant building (also referred to as “Circular House”) containing offices, laboratories, meeting rooms, and experience functions. [newline] Brightlands Chemelot Campus i

45000000Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME9592×
2BINX Smartility B.V.SME9527×
3Van Gelder BVSME9553×
4Combinatie Heijmans - SWARCOUnknown9473×
5Heijmans Infra B.V.SME9465×
6Dura Vermeer Infra Regionale Projecten BVSME9458×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the Brightlands Circular Space (BCS) development?
The Brightlands Circular Space comprises the realization of preprocessing halls, material processing halls, and a mixed-use multitenant building named the Circular House, containing offices, laboratories, meeting rooms, and experience functions.
What is the purpose of the framework agreement for the Brightlands Chemelot Campus?
The framework agreement is intended for the engineering and execution of the works within the Brightlands Circular Space programme, including the Cleanroom halls.
How is the organization of the Brightlands Circular Space structured?
The development and realization of the Brightlands Circular Space is organized as a programme in which the various components, such as the halls and the Circular House, fall under one framework agreement with one market party.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159