Framework Agreement Dredging
Hoogheemraadschap van Rijnland has established a framework agreement for dredging for a duration of four years. The agreement is open and intended for four contractors who have submitted bids based on the Most Economically Advantageous Tender (EMVI). The selected parties must perform both the preparatory works and the actual dredging works within the management area of the water board. The focus lies on an optimal price-quality ratio, with the EMVI criteria being central. The assignment requires good knowledge of water management, dredging, and civil engineering, and the ability to deliver within the specified timeframe and quality requirements. The framework agreement offers flexibility for future assignments and enables the water board to coordinate multiple projects efficiently.
Works · Open · European procedure
01What is being requested
Hoogheemraadschap van Rijnland has established a framework agreement for dredging for a duration of four years. The agreement is open and intended for four contractors who have submitted bids based on the Most Economically Advantageous Tender (EMVI). The selected parties must perform both the preparatory works and the actual dredging works within the management area of the water board. The focus lies on an optimal price-quality ratio, with the EMVI criteria being central. The assignment requires good knowledge of water management, dredging, and civil engineering, and the ability to deliver within the specified timeframe and quality requirements. The framework agreement offers flexibility for future assignments and enables the water board to coordinate multiple projects efficiently.
A Framework Agreement has been drawn up for this assignment. The Framework Agreement will be entered into for a period of four (4) years. HHR wants to contract four (4) Contractors for the present assignment. This Framework Agreement will be awarded to the four (4) Bidders who have offered the Most Economically Advantageous Tender (EMVI) based on the best price-quality ratio. The assignment is carried out within the management area of Hoogheemraadschap van Rijnland and includes the necessary preparatory works as well as the dredging works themselves.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the intended duration of the framework agreement?
How many contractors will be contracted through this framework agreement?
On what award principle does the selection take place?
What is the scope of the works within the assignment?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159