ClosedWorksEuropeanRestricted

PZAD-323 Adjusting metro tracks and platforms Amsterdam Zuid station

Gemeente Amsterdam, Metro en Tram · Restricted · 221396
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Amsterdam, Metro en Tram has a non-public tender for the adjustment of metro tracks and the realization of a terminal station at Amsterdam Zuid station. The project is part of the broader Project Zuidasdok and focuses on the final alignment of tracks M3 and M4 east of the Minervapassage, shortening the Noord/Zuidlijn, and expanding the Britten B construction site. The works include, among other things, laying new tracks, widening the access to the construction site, and creating more space and time for the contractor in the summer of 2022. The assignment is a works contract without a CPV code, aimed at infrastructure improvement and public transport, with a focus on safety, continuity of metro transport, and minimal disruption to the existing infrastructure.

Works · Restricted · European procedure

European
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendermetro tracksterminal stationAmsterdam Zuid

01What is being requested

The Municipality of Amsterdam, Metro en Tram has a non-public tender for the adjustment of metro tracks and the realization of a terminal station at Amsterdam Zuid station. The project is part of the broader Project Zuidasdok and focuses on the final alignment of tracks M3 and M4 east of the Minervapassage, shortening the Noord/Zuidlijn, and expanding the Britten B construction site. The works include, among other things, laying new tracks, widening the access to the construction site, and creating more space and time for the contractor in the summer of 2022. The assignment is a works contract without a CPV code, aimed at infrastructure improvement and public transport, with a focus on safety, continuity of metro transport, and minimal disruption to the existing infrastructure.

Following the termination of the agreement for the realization of Project Zuidasdok, the joint contracting authorities have decided to re-tender the scope of the Zuidasdok project in several work packages. One of these work packages is the OVT (public transport terminal). Ahead of the realization of that work package, more space and time is being created through the present project for the contractor of the BDS summer 2022. For this purpose, the Noord/Zuidlijn tracks must become a terminal station. The works include laying the M3 and M4 tracks on their final alignment east of the Minervapassag

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9792×
2BAM Infra B.V.SME9777×
3Hegeman Bouw & Infra B.V.SME9631×
4VolkerRail Nederland B.V.SME9530×
5Dura Vermeer Infra Regionale Projecten BVSME9458×
6Anton Rail & Infra B.V.SME9421×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of this project within Project Zuidasdok?
This project creates more space and time for the contractor of the BDS summer 2022 by converting the Noord/Zuidlijn tracks into a terminal station.
What specific works on the metro tracks must be carried out?
The works include laying the M3 and M4 tracks on their final alignment east of the Minervapassage and realizing a terminal station for the Noord/Zuidlijn (shortening).
What is the intended effect on the Britten B construction site?
Through the realization of the terminal station and the adjustments to the tracks, the Britten B construction site can be expanded, including widening the access to this site.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159