ClosedWorksEuropeanOnderhandeling zonder bekendmaking

Publication of voluntary transparency for the construction and development of a heat network in the Westland (POL 1 and other route sections)

N.V. HVC · Onderhandeling zonder bekendmaking · 1 lots · 343189
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The project concerns the construction and development of a heat network in the Westland (POL 1 and other route sections) to be executed by Warmte Netwerk Westland C.V. (WNW) in collaboration with Nijkamp Energiedistributie BV. A permit application will be announced in advance, and a mini-competition will be offered to recognized contractors for an additional scope in the northern area. The total annual sum is approximately €9 million excl. VAT. There is no deadline yet and the value of the lot is unknown.

Works · Onderhandeling zonder bekendmaking · European procedure

European
Contracting authority
Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The project concerns the construction and development of a heat network in the Westland (POL 1 and other route sections) to be executed by Warmte Netwerk Westland C.V. (WNW) in collaboration with Nijkamp Energiedistributie BV. A permit application will be announced in advance, and a mini-competition will be offered to recognized contractors for an additional scope in the northern area. The total annual sum is approximately €9 million excl. VAT. There is no deadline yet and the value of the lot is unknown.

In the context of prior voluntary transparency, as intended in article 4.16 AW 2012, for the construction and development of a heat network in the Westland (POL 1 and other route sections), Warmte Netwerk Westland C.V. (WNW) as the Contracting Authority intends to enter into an agreement with Nijkamp Energiedistributie BV. For Polanen 1, it concerns roughly 5.3 km over 2 route sections; the remaining scope (implementation decision expected to be taken in Q3-2024) concerns roughly 6.2 km over 3 route sections. The backbone (DN300) has a length of approximately 4.5 km, the remaining 7 km are tra

45000000Works
1Publication of voluntary transparency for the construction and development of a heat network in the Westland (POL 1 and other route sections)

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9865×
2BAM Infra B.V.SME9577×
3Dura Vermeer Infra Regionale Projecten BVSME9558×
4Boskalis Nederland B.V.SME9569×
5KWS Infra B.V.SME9492×
6ENGIE Infra & Mobility B.V.SME9469×

05Legal themes that may be relevant here

06Frequently asked questions

What is the technical scope of the planned works?
The project includes approximately 5.3 km over 2 route sections for Polanen 1 and approximately 6.2 km over 3 route sections for the remaining scope. The backbone (DN300) has a length of approximately 4.5 km, while the remaining 7 km consists of transport and connection pipes with diameters between DN150 and DN80.
Which execution methodology is used for the construction?
Approximately 70% of this heat network will be constructed using trenchless techniques, such as HDD.
How is the scope for the Northern Area managed?
The scope still to be developed in the Northern Area, consisting of route sections POL3 (excluding POL3.1) and several connection pipes, will be tendered by WNW through a mini-competition among recognized contractors.
What are the main reasons for the intended agreement with Nijkamp Energiedistributie BV?
Reasons include the dependency of various POL areas for realization, the efficiency of multiple route sections with a single provider, the designs already available at Nijkamp, the necessity for a minimum preparation period of 1 year, and the avoidance of additional learning and mobilization costs.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159