Public Tender Solar Energy for the benefit of N.V. Nederlandse Gasunie
Gasunie is seeking the supply of renewable solar energy with a capacity of 30 MWp for a period of three years, where the award will be based on the lowest total costs.
Supplies · Open · National procedure
01What is being requested
Supply of renewable electricity from one or more solar parks with a capacity of 30 MWp, corresponding to a volume of 28.5 to 31.5 GWh per year including associated GoO's for the period until 31 May 2029.
This tender concerns the supply of renewable electricity generated by one or more solar park(s) connected to the electricity grid from which Gasunie sources its electricity. The delivered electricity will be physically integrated into Gasunie’s Balancing Responsible Party (BRP) portfolio, ensuring that all volumes are managed within Gasunie’s established balancing and operational framework.
02Strategic insight
When pricing, focus on the combination of the transaction costs and the GoO price, as this is the sole award criterion. Ensure that access to Ariba is arranged in a timely manner via the ProcurementDesk to avoid missing the deadline.
03Points of attention
04Award criteria
The award is based on the lowest transaction costs plus the lowest GoO price, where the total costs are the sum of the accumulated transaction costs and the GoO's.
05Process & timeline
06Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
07Likely competitors
08Tender documents
09Legal themes that may be relevant here
10Frequently asked questions
What is the intended amount of solar energy for this contract?
What technical integration requirements must the supplied power meet?
What suitability requirements are set for the suppliers?
Automatically compiled from the official tender data and documents.
11Estimated value versus the market
€ 300K
€ 691K
€ 2,0 mln
Gegunde waarden in CPV 09 · leveringen n=226