The Province of Overijssel intends to repair the paving construction and layout of the provincial road N760 between km 2.0 and 10.3. The assignment consists of two phases: phase 2 concerns the rehabilitation of the main carriageway and the replacement of the William Thomsonbrug, phase 3 concerns major maintenance within the built-up area of Kamperzeedijk Oost and West. The project is executed in a construction team (ECI) model; design and execution are realized in two separate phases. The construction team agreement regulates the cooperation, and the execution falls under the UAV 2012. The tender is based on qualitative criteria within a task-oriented budget. The duration of the construction team and realization phases is 2024 to 2025. The contracting authority expects an integrated approach, in which quality, safety, and environmental friendliness are central.
Works · Open · European procedure
01What is being requested
The Province of Overijssel intends to repair the paving construction and layout of the provincial road N760 between km 2.0 and 10.3. The assignment consists of two phases: phase 2 concerns the rehabilitation of the main carriageway and the replacement of the William Thomsonbrug, phase 3 concerns major maintenance within the built-up area of Kamperzeedijk Oost and West. The project is executed in a construction team (ECI) model; design and execution are realized in two separate phases. The construction team agreement regulates the cooperation, and the execution falls under the UAV 2012. The tender is based on qualitative criteria within a task-oriented budget. The duration of the construction team and realization phases is 2024 to 2025. The contracting authority expects an integrated approach, in which quality, safety, and environmental friendliness are central.
On the provincial road N760 between km 2.0 and 10.300, it has been determined that the paving construction and layout no longer meet provincial requirements and standard norms. The N760 must be brought to execution as soon as possible.
02Outcome
KWS Infra B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What does the assignment for the N760 entail?
In what manner will the assignment be executed?
What is the expected duration of the project?
On which criteria will the tender be assessed?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln