Provincie Overijssel - Rehabilitation and Major Maintenance N760 phase 2 and 3
Provincie Overijssel has an open works tender (TTC 338117) for the rehabilitation and major maintenance of the provincial road N760. The works consist of two major phases: (1) the reactivation of the main carriageway and the William Thomson bridge; (2) major maintenance of the built-up area on the Kamperzeedijk. The contract is handled in a collaborative partnership (construction team) – first project design, then execution under the UAV 2012 conditions.
Works · Open · European procedure
01What is being requested
Provincie Overijssel has an open works tender (TTC 338117) for the rehabilitation and major maintenance of the provincial road N760. The works consist of two major phases: (1) the reactivation of the main carriageway and the William Thomson bridge; (2) major maintenance of the built-up area on the Kamperzeedijk. The contract is handled in a collaborative partnership (construction team) – first project design, then execution under the UAV 2012 conditions.
On the provincial road N760 between km 2.0 and 10.300, it has been determined that the paving structure and layout no longer meet provincial requirements and standard norms. The N760 must be brought to execution as soon as possible. Can be summarized as follows: Phase 2 and 3 concern Major Maintenance and Rehabilitation of the main carriageway and bridge of the N760: • Phase 2 – Rehabilitation Main Carriageway and Bridge • The rehabilitation of the main carriageway, outside the built-up area, from km 2.05 to km 6.25; • The replacement of the William Thomson bridge from km 8.60 – km 8.70
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What exactly does the contract for the N760 phase 2 and 3 entail?
In what manner will the contract be executed?
What is the expected duration of the project?
On what basis will the tender take place?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159