Project management for the development of the outdoor space Inge de Bruijn swimming pool
Barendrechtse Exploitatie Beheer en Onderhoud Maatschappij B.V. is requesting an open procedure for a construction project surrounding the Inge de Bruijn swimming pool. The assignment includes the realization of a new 8–10 × 25 m pool with a depth of 1.4 m, including a canopy, the expansion of the existing catering facilities, the installation of playground equipment, the construction of a spray park/water playground, the modification of the sunbathing area, and the renovation or replacement of the current water slide with the addition of a second slide. The tender requires integrated project management, technical design, construction, safety and environmental management, and delivery in accordance with Dutch laws and regulations. The contracting authority expects a fully functional, safe, and attractive recreational area that meets the requirements for accessibility, sustainability, and maintenance.
Works · Open · National procedure
01What is being requested
Barendrechtse Exploitatie Beheer en Onderhoud Maatschappij B.V. is requesting an open procedure for a construction project surrounding the Inge de Bruijn swimming pool. The assignment includes the realization of a new 8–10 × 25 m pool with a depth of 1.4 m, including a canopy, the expansion of the existing catering facilities, the installation of playground equipment, the construction of a spray park/water playground, the modification of the sunbathing area, and the renovation or replacement of the current water slide with the addition of a second slide. The tender requires integrated project management, technical design, construction, safety and environmental management, and delivery in accordance with Dutch laws and regulations. The contracting authority expects a fully functional, safe, and attractive recreational area that meets the requirements for accessibility, sustainability, and maintenance.
The project includes the following works: - Realization of a new pool of 8 to 10 x 25 m with a depth of 1.4 meters; - Canopy for the new pool; - Expansion of current catering facilities; - Installation of playground equipment; - Realization of a spray park/water playground; - Modification of the sunbathing area; - Renovation/replacement of the current water slide and realization of a 2nd slide.
02Value in context
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What are the specific works within this project?
What is the scope of the new swimming pool facilities to be realized?
Automatically compiled from the official tender data and documents.
06Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159