CancelledServicesEuropeanRestricted

Project Fysieke Toegang (PFT) Construction Team (BT) (DIG-12803)

Hoogheemraadschap van Rijnland · Restricted · 1 lots · 270230
Type
Services
71317000
Estimated value
Not published
To deadline
-1364d
Sep 22, 2022 · 12:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Hoogheemraadschap van Rijnland is seeking a service provider for the management, operation, and integration of existing and new security systems. The assignment includes the expansion, improvement, and replacement of systems within the project ‘Project Fysieke Toegang (PFT) Construction Team (BT)’. The supplier must have experience in integrating various security solutions, including access control, video surveillance, and alarm systems, and must be capable of managing both existing and new installations. The services must comply with security standards and ensure operational continuity. The procedure is non-public, meaning the procurement is directed at a limited number of selected bidders. The contracting authority expects a structured approach, clear reporting, and a maintenance plan that guarantees the reliability and scalability of the security infrastructure.

Services · Restricted · European procedure

European
Contracting authority
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
September 22, 2022
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Leiden
CharacteristicsCPV 71ServicesEU tendersecurity systemsintegrationmanagement

01What is being requested

Hoogheemraadschap van Rijnland is seeking a service provider for the management, operation, and integration of existing and new security systems. The assignment includes the expansion, improvement, and replacement of systems within the project ‘Project Fysieke Toegang (PFT) Construction Team (BT)’. The supplier must have experience in integrating various security solutions, including access control, video surveillance, and alarm systems, and must be capable of managing both existing and new installations. The services must comply with security standards and ensure operational continuity. The procedure is non-public, meaning the procurement is directed at a limited number of selected bidders. The contracting authority expects a structured approach, clear reporting, and a maintenance plan that guarantees the reliability and scalability of the security infrastructure.

The contracting authority wishes to integrate the management and operation of existing and new security systems and to improve systems by expanding and/or replacing existing systems with new systems.

71317000Services
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Arcadis Nederland B.V.SME97151×
2Sweco Nederland B.V. SME9695×
3Haskoning Nederland B.V.SME95129×
4Witteveen+Bos Raadgevende ingenieurs B.V.SME9588×
5RPS advies- en ingenieursbureau B.V.SME9438×
6 DVTadvies B.V.SME9018×

05Tender documents

TN373960 - SF03 Aankondiging van een gegunde opdracht 20230403160921pdfApr 3, 2023 · 26 KB
NVI DIG-12803 6sep22 defpdfSep 6, 2022 · 58 KB
TN373960 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20220906144002pdfSep 6, 2022 · 13 KB
TN373960 - SF02 Aankondiging van een opdracht 20220822161130pdfAug 24, 2022 · 32 KB
Leidraad en bijlagenzipAug 24, 2022 · 3794 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the assignment for Project Fysieke Toegang (PFT) Construction Team (BT)?
The assignment concerns the management and operation of existing and new security systems. This includes the integration, improvement, expansion, and/or replacement of systems within the project.
What activities are expected regarding the integration of security systems?
The contracting authority wishes to integrate existing and new security systems, focusing on improving the systems through expansion or replacement.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713