Vitens N.V. intends to replace the existing drinking water production location at the Pinkenberg in Rozendaal with a new facility with a capacity of 2 Mm³/year. The new construction is located on a plot opposite the current location and consists of two treatment lines, each with two pressure filters, a distribution room, an indoor clean water reservoir, new underground infrastructure, nature-inclusive site design, and full cabling to and from the extraction field, including the replacement of seven extraction wells. The project faces various challenges: a deep basement construction near the boundary, limited construction space with significant earthworks, logistical complexity, location in a residential villa area surrounded by national monuments, and within a Natura 2000 area. The contract form is a construction team (bouwteam) model with a 2-phase process (design phase and realization/execution phase). The tender is public and focused on an integrated approach to water treatment, infrastructure, and environmentally compatible construction.
Works · Open · European procedure
01What is being requested
Vitens N.V. intends to replace the existing drinking water production location at the Pinkenberg in Rozendaal with a new facility with a capacity of 2 Mm³/year. The new construction is located on a plot opposite the current location and consists of two treatment lines, each with two pressure filters, a distribution room, an indoor clean water reservoir, new underground infrastructure, nature-inclusive site design, and full cabling to and from the extraction field, including the replacement of seven extraction wells. The project faces various challenges: a deep basement construction near the boundary, limited construction space with significant earthworks, logistical complexity, location in a residential villa area surrounded by national monuments, and within a Natura 2000 area. The contract form is a construction team (bouwteam) model with a 2-phase process (design phase and realization/execution phase). The tender is public and focused on an integrated approach to water treatment, infrastructure, and environmentally compatible construction.
Vitens intends to replace the drinking water production location at the Pinkenberg in Rozendaal. The new production location with a capacity of 2 Mm³/year will be built on a plot opposite the current location. The new construction concerns a production building consisting of 2 treatment lines with each 2 pressure filters, a distribution room with distribution and flushing water pumps, an (indoor) clean water reservoir, new underground infrastructure, nature-inclusive site design, and replacement of the cabling to and from the extraction field (incl. replacement of 7 extraction wells). The proj
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the intended capacity of the new drinking water production location?
What does the construction of the new facility entail?
In what manner will the contract be executed?
What specific challenges are there in the realization of this project?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln