ClosedWorksEuropeanOpen

PRJ - Pinkenberg PB NB prod.locatie

Vitens N.V. · Open · 1 lots · 309271
Type
Works
45000000
Estimated value
€ 16M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Vitens N.V. intends to replace the existing drinking water production location at the Pinkenberg in Rozendaal with a new facility with a capacity of 2 Mm³/year. The new construction is located on a plot opposite the current location and consists of two treatment lines, each with two pressure filters, a distribution room, an indoor clean water reservoir, new underground infrastructure, nature-inclusive site design, and full cabling to and from the extraction field, including the replacement of seven extraction wells. The project faces various challenges: a deep basement construction near the boundary, limited construction space with significant earthworks, logistical complexity, location in a residential villa area surrounded by national monuments, and within a Natura 2000 area. The contract form is a construction team (bouwteam) model with a 2-phase process (design phase and realization/execution phase). The tender is public and focused on an integrated approach to water treatment, infrastructure, and environmentally compatible construction.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€15,500,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Zwolle
CharacteristicsCPV 45WorksEU tenderdrinking water productiontreatment linepressure filter

01What is being requested

Vitens N.V. intends to replace the existing drinking water production location at the Pinkenberg in Rozendaal with a new facility with a capacity of 2 Mm³/year. The new construction is located on a plot opposite the current location and consists of two treatment lines, each with two pressure filters, a distribution room, an indoor clean water reservoir, new underground infrastructure, nature-inclusive site design, and full cabling to and from the extraction field, including the replacement of seven extraction wells. The project faces various challenges: a deep basement construction near the boundary, limited construction space with significant earthworks, logistical complexity, location in a residential villa area surrounded by national monuments, and within a Natura 2000 area. The contract form is a construction team (bouwteam) model with a 2-phase process (design phase and realization/execution phase). The tender is public and focused on an integrated approach to water treatment, infrastructure, and environmentally compatible construction.

Vitens intends to replace the drinking water production location at the Pinkenberg in Rozendaal. The new production location with a capacity of 2 Mm³/year will be built on a plot opposite the current location. The new construction concerns a production building consisting of 2 treatment lines with each 2 pressure filters, a distribution room with distribution and flushing water pumps, an (indoor) clean water reservoir, new underground infrastructure, nature-inclusive site design, and replacement of the cabling to and from the extraction field (incl. replacement of 7 extraction wells). The proj

45000000€ 16MWorks
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€15,500,000

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9766×
2KWS Infra B.V.SME9392×
3Van Gelder BVSME9353×
4Den Ouden Aannemingsbedrijf B.V.SME9323×
5Boskalis Nederland B.V.SME9270×
6Anton Rail & Infra B.V.SME9021×

05Legal themes that may be relevant here

06Frequently asked questions

What is the intended capacity of the new drinking water production location?
The new production location at the Pinkenberg will have a capacity of 2 Mm³/year.
What does the construction of the new facility entail?
The new construction includes a production building with two treatment lines (each with two pressure filters), a distribution room with pumps, an indoor clean water reservoir, new underground infrastructure, nature-inclusive site design, and the replacement of the cabling to the extraction field including seven extraction wells.
In what manner will the contract be executed?
The contract will be executed in a construction team (bouwteam) model via a 2-phase process, consisting of a design phase and a realization/execution phase.
What specific challenges are there in the realization of this project?
The construction faces challenges such as a deep basement construction near the boundary, limited construction space with significant earthworks, logistical complexity, the location in a villa area with national monuments, and the location within a Natura 2000 area.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 16 mln

Gegunde waarden in CPV 45 · werken n=3159