AwardedWorksEuropeanOpen

Preventive measures against excavation damage

Waterschap Brabantse Delta · Open · 1 lots · 347676
Type
Works
45246200
Estimated value
€ 1,50M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Waterschap Brabantse Delta has published a tender (tender 347676) to implement preventive measures against excavation damage in dike sections between Waalwijk and Willemstad. The contract concerns works of a public nature, CPV 45246200, in the Netherlands. There are two types of sections: high-risk (damage expected within 2 years) and lower-risk (2–5 years). The measures include slope flattening or the installation of mesh, taking into account protected species and accessibility for equipment. The tender is currently 'awarded'.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€1,500,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Waterschap Brabantse Delta has published a tender (tender 347676) to implement preventive measures against excavation damage in dike sections between Waalwijk and Willemstad. The contract concerns works of a public nature, CPV 45246200, in the Netherlands. There are two types of sections: high-risk (damage expected within 2 years) and lower-risk (2–5 years). The measures include slope flattening or the installation of mesh, taking into account protected species and accessibility for equipment. The tender is currently 'awarded'.

Animal burrows are being observed increasingly frequently within the living environment of Waterschap Brabantse Delta. This can lead to conflicts regarding water safety. Burrowing species can dig tunnels in the dike, causing the dike to lose its stability. In the worst-case scenario, the dike may no longer be able to hold back the water.

45246200€ 1,50MWorks
1Preventive measures against excavation damage€1,500,000

02Outcome

Awarded

B. Minekus Zuidland B.V.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€1,500,000

05Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME9792×
2Boskalis Nederland B.V.SME9669×
3Heijmans Infra B.V.SME9665×
4Van Gelder BVSME9653×
5BAM Infra B.V.SME9577×
6Dura Vermeer Infra Regionale Projecten BVSME9558×

06Legal themes that may be relevant here

07Frequently asked questions

What is the purpose of the preventive measures?
The measures are intended to ensure the stability of the dikes. Animal burrows can cause tunnels in the dike, which endangers water safety.
What types of measures are being considered for the dike sections?
Consideration is being given to flattening the slope to discourage burrowers. If flattening is not feasible due to space or accessibility for equipment, the installation of mesh in the dike is proposed.
How is the local fauna taken into account?
During the execution of the works, the strict legislation regarding the protected status of the beaver, badger, and to a lesser extent the muskrat, must be followed.
What is the difference between the high-risk and lower-risk sections?
For high-risk sections, it is expected that the flood defense will sustain significant damage due to burrowing within 2 years. For lower-risk sections, this damage is expected within a period of 2 to 5 years.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 1,5 mln

Gegunde waarden in CPV 45 · werken n=3159