Raising and redesigning of Hogendorpstraat and surroundings
This project comprises the integral redesign and raising of the Van Hogendorpstraat in Schiedam, with a focus on climate adaptation and sustainability. The contract will be awarded based on the best price-quality ratio of 70:30.
Works · Restricted · National procedure
01What is being requested
The assignment concerns the raising and redesigning of the Van Hogendorpstraat and surroundings in Schiedam, including the installation of sewerage, paving, greenery and street furniture for an estimated value of approx. € 3 million.
The main elements of the neighborhood approach are broadly as follows: • Raising and sustainable reconstruction of the public space; settlement requirement set at 25 cm over 30 years; • Climate-adaptive design of the public space and water management; • Optimization of public greenery; • Removal of old and installation of new play facilities; • Preserving as many existing trees as possible and planting new trees; • Raising cables and pipelines as a result of the raising; • Ensuring accessibility and livability for the surrounding area during execution.
02Strategic insight
Ensure a very strong plan of approach to maximize the fictitious discount on the price. Pay extra attention to the climate-adaptive measures and the water management in the design. Do not forget to correctly integrate the social conditions regarding SROI into the bid.
03Points of attention
04Can I take part?
05Exclusion grounds
- Exclusion grounds in accordance with article 2.86 and 2.87 AW 2012
06Award criteria
Assessment of the plan of approach, the risk dossier, and sustainability via a fictitious discount.
The award takes place on the basis of the best price-quality ratio.
07Process & timeline
08Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
09Likely competitors
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What are the most important technical requirements for the reconstruction of the public space?
Which works are carried out regarding climate adaptation and greenery?
Which works are necessary for the facilities and infrastructure in the neighborhood?
How is livability ensured during the execution of the works?
Automatically compiled from the official tender data and documents.