AwardedWorksEuropeanRestricted

Design & Realisation Sportcomplex Rietlanden III

Gemeente Lelystad · Restricted · 1 lots · 360295
Type
Works
45000000
Estimated value
€ 18M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Lelystad intends to expand the existing Sportcomplex Rietlanden II with eight new halls and various supporting functions. The assignment is an integrated construction contract where design and realisation are carried out using a 2-step approach. In step 1, the contracting authority and the contractor work together on a supported design, manage risks, and determine a realistic price. Step 2 follows based on the established conditions, during which the contracting authority remains fully involved and the contractor's expertise is utilized optimally. The construction team approach requires intensive cooperation, transparency regarding the budget and risk management, and joint decision-making on solutions and ideas. The tender is non-public, aimed at a small to medium-sized company with experience in sports facilities and integrated construction projects.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€17,900,000
estimated value
Submission deadline
Ongoing
13:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendersports complexconstruction teamdesign

01What is being requested

The Municipality of Lelystad intends to expand the existing Sportcomplex Rietlanden II with eight new halls and various supporting functions. The assignment is an integrated construction contract where design and realisation are carried out using a 2-step approach. In step 1, the contracting authority and the contractor work together on a supported design, manage risks, and determine a realistic price. Step 2 follows based on the established conditions, during which the contracting authority remains fully involved and the contractor's expertise is utilized optimally. The construction team approach requires intensive cooperation, transparency regarding the budget and risk management, and joint decision-making on solutions and ideas. The tender is non-public, aimed at a small to medium-sized company with experience in sports facilities and integrated construction projects.

Design and realisation of a sports complex. The existing sport complex Rietlanden II will be expanded with 8 halls including various supporting functions. The whole must function integrally. A construction team is a 2-step approach in which the contracting authority and the contractor work together during the design phase to create a supported design, manage risks, and establish a realistic price (step 1) in order to subsequently proceed through the realisation phase in a controlled manner (step 2). Through intensive cooperation, a situation is created in which the knowledge and expertise of t

45000000€ 18MWorks
1Design and realisation of a sports complex.€17,900,000

02Outcome

Awarded

Bouwgroep Dijkstra Draisma

Award value
€19,000,000
vs. estimate
+6%
Bidders
4

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€17,900,000

05Bidders in this segment

#Likely bidderFitWins
1BINX Smartility B.V.SME9727×
2BAM Infra B.V.SME9578×
3Sweco Nederland B.V. SME9420×
4KWS Infra B.V.SME9392×
5Van Gelder BVSME9353×
6Arcadis Nederland B.V.SME9239×

06Legal themes that may be relevant here

07Frequently asked questions

What does the chosen construction team approach entail for this project?
A 2-step approach is used. In step 1, the contracting authority and the contractor work together on a supported design, the management of risks, and the establishment of a realistic price. In step 2, the realisation phase follows based on the established conditions.
What is the scope of the expansion of Sportcomplex Rietlanden II?
The existing sports complex is being expanded with eight new halls and various supporting functions, whereby the whole must function integrally.
What form of cooperation is expected during the design phase?
The assignment requires intensive cooperation in which the knowledge and expertise of the contractor is utilized optimally and the contracting authority remains fully involved in the design process. There is room for joint decision-making on solutions and ideas.
How are the budget and risks handled?
During the cooperation, openness and transparency regarding the control of the budget and risks are aimed for.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 18 mln

Gegunde waarden in CPV 45 · werken n=3159