Design, realization and maintenance Aardgasvrij Eindhoven-Noordoost
The Municipality of Eindhoven aims to make the Eindhoven-Noordoost area completely gas-free. The assignment comprises four phases: design (D), realization (B), and a five-year maintenance period (M), with the possibility of long-term maintenance. The procurement is a non-public procedure for a works contract. The contractor must provide an integrated approach that complies with safety and environmental standards, including the safe removal of existing gas pipelines, ensuring the continuity of the gas supply for residents, and realizing a sustainable, gas-free infrastructure. The works require expertise in gas infrastructure, civil engineering, project management, and maintenance strategies. The municipality expects a complete project plan, a detailed execution timeline, a maintenance plan, and a risk and safety plan. The contractor must demonstrate experience with similar projects, possess the appropriate certifications, and have a financially stable profile.
Works · Restricted · European procedure
01What is being requested
The Municipality of Eindhoven aims to make the Eindhoven-Noordoost area completely gas-free. The assignment comprises four phases: design (D), realization (B), and a five-year maintenance period (M), with the possibility of long-term maintenance. The procurement is a non-public procedure for a works contract. The contractor must provide an integrated approach that complies with safety and environmental standards, including the safe removal of existing gas pipelines, ensuring the continuity of the gas supply for residents, and realizing a sustainable, gas-free infrastructure. The works require expertise in gas infrastructure, civil engineering, project management, and maintenance strategies. The municipality expects a complete project plan, a detailed execution timeline, a maintenance plan, and a risk and safety plan. The contractor must demonstrate experience with similar projects, possess the appropriate certifications, and have a financially stable profile.
The contracting authority wishes to make Eindhoven-Noordoost gas-free with the present assignment and to outsource the construction stages: design (D), realization (B), five years of maintenance (M), and potentially long-term maintenance (M) to a market party.
02Outcome
Heijmans Energie B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What is the scope of the assignment for Eindhoven-Noordoost?
Which phases are included in the assignment?
What are the main technical requirements of the assignment?
Which plans must be submitted during execution?
Automatically compiled from the official tender data and documents.
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159