ClosedWorksEuropeanCompetitive dialogue

Design, implementation and commissioning of the new Waste Water Treatment plant (WWTP) installation and integration into existing business operations

Twence B.V. · Competitive dialogue · 1 lots · 358714
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This contract concerns the design, implementation, and commissioning of a new wastewater treatment plant (WWTP) for Twence B.V. The procurement follows the procedural framework of a competitive dialogue, whereby the contractor works closely with the contracting authority to develop an optimal solution. The new installation must integrate seamlessly into existing business operations, comply with current and future environmental legislation, and improve operational efficiency. Key aspects include the design of the treatment processes, the construction of the facility, the installation of automation and control systems, and full commissioning including testing and handover. The contractor must also ensure sound project management, cost control, safety, and quality assurance. The contract requires a high level of technical expertise, experience with water and wastewater treatment, and knowledge of the relevant regulations.

Works · Competitive dialogue · European procedure

European
Contracting authority
Contract type
Works
Competitive dialogue
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderWWTPwastewater treatmentdesign-build

01What is being requested

This contract concerns the design, implementation, and commissioning of a new wastewater treatment plant (WWTP) for Twence B.V. The procurement follows the procedural framework of a competitive dialogue, whereby the contractor works closely with the contracting authority to develop an optimal solution. The new installation must integrate seamlessly into existing business operations, comply with current and future environmental legislation, and improve operational efficiency. Key aspects include the design of the treatment processes, the construction of the facility, the installation of automation and control systems, and full commissioning including testing and handover. The contractor must also ensure sound project management, cost control, safety, and quality assurance. The contract requires a high level of technical expertise, experience with water and wastewater treatment, and knowledge of the relevant regulations.

Design, implementation and commissioning of the new Waste Water Treatment plant (WWTP) installation and integration into existing business operations

45000000Works
1Design, implementation and commissioning of the new Waste Water Treatment plant (WWTP) installation and integration into existing business operations

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9765×
2BAM Bouw en Techniek bvSME9534×
3Dura Vermeer Infra Regionale Projecten BVSME9458×
4Croonwolter&dros B.V.SME9225×
5Den Ouden Aannemingsbedrijf B.V.SME9223×
6Van Hattum & Blankevoort N.V.SME9219×

05Legal themes that may be relevant here

06Frequently asked questions

What activities are expected during the commissioning of the WWTP installation?
The activities include full commissioning, which includes the testing and final handover of the installation.
What are the most important technical aspects of the contract?
The contract focuses on the design of the treatment processes, the construction of the facility, the installation of automation and control systems, and the integration into current business operations.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159