AwardedWorksEuropeanRestricted

Design and realization of public space Stationsgebied Zuid (Stationsplein with Stationsweg)

Gemeente Eindhoven · Restricted · 1 lots · 356095
Type
Works
45233000
Estimated value
€ 18M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This document describes the policy and implementation conditions for Social Return (SROI) within the Zuidoost-Brabant labor market region, including the target groups and the method of valuation.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€18,189,350
awarded value
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderpublic spacestationspleinStationsweg

01What is being requested

The assignment concerns the design and realization of the public space in the Stationsgebied Zuid, specifically the Stationsplein with the Stationsweg.

The contracting authority wishes, with the present assignment, to design and realize the public space Stationsgebied Zuid (Stationsplein with Stationsweg).

45233000Works
1Entire assignment

02Outcome

Awarded

Strukton Wegen & Beton

Award value
€18,189,350
Bidders
4

03Strategic insight

Strategic insight · AI analysis
Ensure good social commitment by making use of various implementation options such as work-study programs or social enterprises. Obtaining a PSO certificate can serve as an alternative way to meet the obligations. Take into account the accountability via the monitoring system and the timely submission of supporting documents.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
For labor-intensive assignments, a minimum Social Return obligation of 5% of the contract sum applies.Important
For labor-extensive assignments, a minimum Social Return obligation of 2% of the contract sum applies.Important
Failure to comply with the obligation may lead to a fine of one and a half times the unapplied percentage.Important
The implementation of the Social Return must be reported in the WIZZR system.Important
For activities such as training or social added value, prior agreement from the coordinator is required.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Van Gelder BVSME10053×
2Dura Vermeer Infra Regionale Projecten BVSME10058×
3KWS Infra B.V.SME9892×
4Combinatie Heijmans - SWARCOUnknown9873×
5Heijmans Infra B.V.SME9865×
6Boskalis Nederland B.V.SME9769×

08Tender documents

TN492854 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250724155702pdfJul 26, 2025 · 12 KB
RD2024-0026 SL v1.2 (NvI) wijz zichtbpdfNov 28, 2024 · 470 KB
RD2024-0026 NvI v1.0pdfNov 28, 2024 · 249 KB
RD2024-0026 SL v1.2 (NvI)pdfNov 28, 2024 · 469 KB
RD2024-0026 SL_B3 verklaring russiche bandenpdfNov 6, 2024 · 79 KB
RD2024-0026 SL_B4 SROIpdfNov 6, 2024 · 695 KB
TN492854 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20241104163234pdfNov 6, 2024 · 11 KB
RD2024-0026 SL_IF A UEApdfNov 6, 2024 · 1541 KB
RD2024-0026 SL_IF B Ervaring DeelnemerdocxNov 6, 2024 · 23 KB
RD2024-0026 SL_B2 DNR EindhovenpdfNov 6, 2024 · 848 KB
RD2024-0026 SL_B1 VOpdfNov 6, 2024 · 1877 KB

09Legal themes that may be relevant here

10Frequently asked questions

What does the assignment entail for the contractor regarding the environment?
The contractor must support the contracting authority in its broader role as an integrated environment manager. This includes coordinating environmental and safety aspects, ensuring a sustainable and accessible environment, and facilitating stakeholder engagement.
Which specific activities are part of the design and realization?
The activities include, among other things, the design of paving, lighting, and greenery, the realization of traffic and pedestrian infrastructure, the integration of digital information provision, and ensuring accessibility for persons with a disability.
Which social conditions apply to this assignment?
The assignment falls under the Social Return policy 2022 of the Zuidoost-Brabant labor market region. This instrument is intended to sustainably get people with a distance to the labor market into work, in accordance with the Participation Act (Participatiewet) and the Jobs Agreement Act and quota for disabled workers (Wet Banenafspraak en quotum arbeid beperkten).

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 18 mln

Gegunde waarden in CPV 45 · werken n=3159