Offshore pipeline installation
This tender concerns the offshore installation of a 20 km long pipeline in the Maasgeul, including nearby dredging, pulling pipes via a pre-installed HDPE carrier pipe, and the placement of MLPP pipes with corrosion and thermal insulation and a concrete weight coating. The works include backfilling the dredged sections, excavating and backfilling non-dredged sections, the fabrication and installation of subsea spool pieces and the connection to the riser, as well as the fabrication and installation of the riser and associated clamps. A boat landing is optional. The tender also requires pre-commissioning activities from the onshore battery limit. The procedure is a competitive procedure with negotiation, aimed at a high technical and logistical level, with emphasis on safety, environmental protection, and precise planning. The contracting authority, Porthos Offshore Transport and Storage C.V., expects an integrated approach that complies with international standards for offshore construction and pipeline installation.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
This tender concerns the offshore installation of a 20 km long pipeline in the Maasgeul, including nearby dredging, pulling pipes via a pre-installed HDPE carrier pipe, and the placement of MLPP pipes with corrosion and thermal insulation and a concrete weight coating. The works include backfilling the dredged sections, excavating and backfilling non-dredged sections, the fabrication and installation of subsea spool pieces and the connection to the riser, as well as the fabrication and installation of the riser and associated clamps. A boat landing is optional. The tender also requires pre-commissioning activities from the onshore battery limit. The procedure is a competitive procedure with negotiation, aimed at a high technical and logistical level, with emphasis on safety, environmental protection, and precise planning. The contracting authority, Porthos Offshore Transport and Storage C.V., expects an integrated approach that complies with international standards for offshore construction and pipeline installation.
The work consists of the offshore installation works, including: • Dredging work in the nearshore zone and in the Maasgeul • The execution of the shore crossing by pipe pull through a pre-installed HDPE carrier pipe. • The installation of the offshore pipeline section. Approximately 20 km. The primary pipe configuration is a 16 inch nominal diameter, MLPP anti corrosion & thermal insulation coating with a concrete weight coating on top of the MLPP. • Backfilling of the dredged sections of pipeline • Post-lay trenching and backfilling of the non-dredged sections of the pipeline • The fabricati
02Outcome
Allseas Nederland (Brasil) B.V.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Tender documents
07Legal themes that may be relevant here
08Frequently asked questions
What does the technical scope of the offshore pipeline installation entail?
Which additional installation works are part of the assignment?
Are there any optional works within this assignment?
Automatically compiled from the official tender data and documents.