Emergency power points with shelter for people with an electric medical device
This is a market consultation for the setup of regional emergency power points with shelter options for people who are dependent on electric medical devices during emergencies.
Supplies · Marktconsultatie · National procedure
01What is being requested
The Ministry of Health, Welfare and Sport is exploring the possibility for multiple service providers to set up regional emergency power points. These points must provide emergency power and shelter for at least 2,000 persons (preferably up to 6,000 persons) for a maximum of 72 hours.
The Ministry of Health, Welfare and Sport (VWS), Medicines and Medical Technology directorate, is preparing a possible Contract/Tender. It concerns assistance during emergencies such as extreme weather, war, or a major outage. Facilities such as home batteries and emergency generators in the home are impractical, expensive, and require maintenance. Through this market consultation, VWS is investigating whether there are (multiple) service providers capable of offering the possibility to set up regional emergency power points where people can be sheltered and receive emergency power for their m
02Strategic insight
<ul Focus on providing a combined solution of both a physical location and a reliable emergency power supply (independent of the public grid). Ensure that accessibility and reachability (including wheelchair users) is an integral part of the proposal. When responding to the market consultation, provide concrete and compact (SMART) answers regarding the expected cost structure for both availability and usage.
03Points of attention
04Process & timeline
05Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.
06Likely competitors
07Tender documents
08Legal themes that may be relevant here
09Frequently asked questions
What is the purpose of the regional emergency power points?
How long must the shelter at an emergency power point be able to last?
Which safety standards must the execution comply with?
What experience is expected from the service providers?
Why is there no focus on home batteries or emergency generators?
Automatically compiled from the official tender data and documents.
10Estimated value versus the market
€ 260K
€ 526K
€ 1,4 mln
Gegunde waarden in CPV 31 · leveringen n=168