Non-invasive, non-intrusive and non-destructive pipeline inspection without disrupting water supply
The tender is closed for an innovative water pipeline inspection that does not disrupt water scarcity and focuses on asbestos cement pipes. **Key points**: - 1 km minimum measurement distance. - No power interruption or pressure loss. - Measures accurate wall thickness and leak detection. - Segmentation report to support reliable decisions. - One-year trial, followed by a long-term contract. **Practical factsheet**:
Services · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
The tender is closed for an innovative water pipeline inspection that does not disrupt water scarcity and focuses on asbestos cement pipes. **Key points**: - 1 km minimum measurement distance. - No power interruption or pressure loss. - Measures accurate wall thickness and leak detection. - Segmentation report to support reliable decisions. - One-year trial, followed by a long-term contract. **Practical factsheet**:
The contracting authority is seeking an innovative solution for inspecting water pipelines, aimed at providing a reliable and efficient assessment of the condition over a minimum length of 1 kilometer. This assessment should be based on the (remaining) wall thickness and the detection of leaks with relatively minimal effort. The proposed solution must meet the following functional requirements: Uninterrupted Water Supply: The inspection method must be capable of assessing the pipelines without disrupting the water supply. This means that no shut-offs, pressure losses, or interruptions in the d
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What are the most important functional requirements for the inspection method?
On which materials must the inspection technology be applicable?
What results must result from the inspection?
What is the intended contract duration for this assignment?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 250K
€ 550K
€ 1,1 mln