ClosedWorksEuropeanRestrictedGreen

New Construction QuTech TU Delft

Technische Universiteit Delft · Restricted · 1 lots · 354812
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Delft University of Technology has a tender for the new construction of the QuTech facility at Campus Zuid. The project includes the design, realization, and maintenance of an optimal working environment for quantum scientists, theorists, and support staff. The emphasis is on functional, flexible laboratories with excellent technical infrastructure, including advanced cooling, radiation, and network facilities. The assignment requires an integrated approach to architecture, construction, installations, and facility services, with attention to sustainability, safety, and scalability. Suppliers must demonstrate experience with high-tech research facilities and be capable of delivering a modular design that can respond to future scientific developments. The procedure is non-public, which means limited competition. The assignment is of great importance to the national quantum strategy and requires a high level of technical expertise and project management.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPQuantumLabConstruction

01What is being requested

Delft University of Technology has a tender for the new construction of the QuTech facility at Campus Zuid. The project includes the design, realization, and maintenance of an optimal working environment for quantum scientists, theorists, and support staff. The emphasis is on functional, flexible laboratories with excellent technical infrastructure, including advanced cooling, radiation, and network facilities. The assignment requires an integrated approach to architecture, construction, installations, and facility services, with attention to sustainability, safety, and scalability. Suppliers must demonstrate experience with high-tech research facilities and be capable of delivering a modular design that can respond to future scientific developments. The procedure is non-public, which means limited competition. The assignment is of great importance to the national quantum strategy and requires a high level of technical expertise and project management.

The design, realization, and maintenance of the best possible working environment at Campus Zuid for quantum scientists, theorists & support staff, with an emphasis on functional, flexible laboratories with excellent technical infrastructure.

45000000Works
1New Construction QuTech TU Delft€1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Utiliteit B.V.SME9727×
2BINX Smartility B.V.SME9427×
3Combinatie Heijmans - SWARCOUnknown9273×
4BAM Bouw en Techniek bvSME9234×
5BAM Infra B.V.SME9277×
6Van Gelder BVSME9253×

05Legal themes that may be relevant here

06Frequently asked questions

What is the core of the assignment for the QuTech new construction?
The assignment concerns the design, realization, and maintenance of an optimal working environment at Campus Zuid for quantum scientists, theorists, and support staff, with a focus on functional and flexible laboratories.
What technical requirements are set for the infrastructure?
The facilities must possess an excellent technical infrastructure suitable for the needs of quantum scientists.
Are there specific criteria regarding sustainability?
Yes, sustainability criteria apply to this assignment.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159