New Construction QuTech TU Delft
Delft University of Technology has a tender for the new construction of the QuTech facility at Campus Zuid. The project includes the design, realization, and maintenance of an optimal working environment for quantum scientists, theorists, and support staff. The emphasis is on functional, flexible laboratories with excellent technical infrastructure, including advanced cooling, radiation, and network facilities. The assignment requires an integrated approach to architecture, construction, installations, and facility services, with attention to sustainability, safety, and scalability. Suppliers must demonstrate experience with high-tech research facilities and be capable of delivering a modular design that can respond to future scientific developments. The procedure is non-public, which means limited competition. The assignment is of great importance to the national quantum strategy and requires a high level of technical expertise and project management.
Works · Restricted · European procedure
01What is being requested
Delft University of Technology has a tender for the new construction of the QuTech facility at Campus Zuid. The project includes the design, realization, and maintenance of an optimal working environment for quantum scientists, theorists, and support staff. The emphasis is on functional, flexible laboratories with excellent technical infrastructure, including advanced cooling, radiation, and network facilities. The assignment requires an integrated approach to architecture, construction, installations, and facility services, with attention to sustainability, safety, and scalability. Suppliers must demonstrate experience with high-tech research facilities and be capable of delivering a modular design that can respond to future scientific developments. The procedure is non-public, which means limited competition. The assignment is of great importance to the national quantum strategy and requires a high level of technical expertise and project management.
The design, realization, and maintenance of the best possible working environment at Campus Zuid for quantum scientists, theorists & support staff, with an emphasis on functional, flexible laboratories with excellent technical infrastructure.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the core of the assignment for the QuTech new construction?
What technical requirements are set for the infrastructure?
Are there specific criteria regarding sustainability?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159