The tender concerns the new construction of the Kompaan College in Vorden, lot 1, carried out by Stichting Achterhoek VO. It concerns a works contract (construction) via a non-open procedure. The contracting authority requests a completely new school building, including facilities for education, sports, and recreation, which complies with Dutch building and safety standards, accessibility guidelines, and energy efficiency criteria. The contractor must provide an integrated project plan with clear phasing, timelines, cost estimates, and quality controls. It is expected that the design and execution comply with the requirements of the Bouwbesluit, the laws and regulations regarding energy (Energy Performance and Indoor Climate, EPB), and the guidelines for sustainable and circular construction. The contracting authority emphasizes good cooperation with the school community, transparent communication, and minimizing disruptions to ongoing activities. The assignment requires an experienced contractor with proven expertise in educational projects, knowledge of local regulations, and a solid portfolio of references.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendernew constructioncollegeVorden

01What is being requested

The tender concerns the new construction of the Kompaan College in Vorden, lot 1, carried out by Stichting Achterhoek VO. It concerns a works contract (construction) via a non-open procedure. The contracting authority requests a completely new school building, including facilities for education, sports, and recreation, which complies with Dutch building and safety standards, accessibility guidelines, and energy efficiency criteria. The contractor must provide an integrated project plan with clear phasing, timelines, cost estimates, and quality controls. It is expected that the design and execution comply with the requirements of the Bouwbesluit, the laws and regulations regarding energy (Energy Performance and Indoor Climate, EPB), and the guidelines for sustainable and circular construction. The contracting authority emphasizes good cooperation with the school community, transparent communication, and minimizing disruptions to ongoing activities. The assignment requires an experienced contractor with proven expertise in educational projects, knowledge of local regulations, and a solid portfolio of references.

New construction Kompaan College in Vorden, lot 1

45210000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1BAM Bouw en Techniek bvSME9634×
2BINX Smartility B.V.SME9627×
3Hegeman Bouw & Infra B.V.SME9531×
4Kernbouw B.V.SME9411×
5Rots Bouw B.V.SME9313×
6Bertens Bouw B.V.SME9013×

05Tender documents

TN404839 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20230418123909pdfApr 18, 2023 · 13 KB
TN404839 - SF02 Aankondiging van een opdracht 20230328090422pdfMar 28, 2023 · 28 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the assignment for the new construction of the Kompaan College?
The assignment concerns the new construction of the Kompaan College in Vorden, lot 1. This includes the construction of a completely new school building with facilities for education, sports, and recreation.
Which technical requirements must the new school building meet?
The design and execution must comply with the requirements of the Bouwbesluit, the laws and regulations regarding energy (Energy Performance and Indoor Climate, EPB), and the guidelines for sustainable and circular construction.
What is expected of the contractor regarding project management?
The contractor must provide an integrated project plan with clear phasing, timelines, cost estimates, and quality controls.
What expertise is required for the execution of this assignment?
The assignment requires an experienced contractor with proven expertise in educational projects, knowledge of local regulations, and a solid portfolio of references.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159