New Construction Arkelstein - De Linde
New construction of educational buildings for Arkelstein and De Linde vso in Deventer via an integrated contract form where design and realization are awarded in one lot based on vision.
Works · Restricted · European procedure
01What is being requested
The assignment concerns the new construction of the Arkelstein and De Linde vso schools at the current location of Arkelstein, with a scope of approximately 4,665 m² GFA and a sports facility of approximately 1,000 m² GFA. Execution takes place in two phases: from the design phase through to Preliminary Design, followed by Final Design through to realization within an initial duration of two years.
New Construction Arkelstein - De Linde
02Strategic insight
<ul Focus during the award phase not on a technical design, but on a vision on designing and the approach to collaboration. Ensure an integrated consortium that can bear full responsibility for both design and realization. Integrate the principles of the Landelijk Programma Onderwijshuisvesting (POHV) and the specific needs of the users (Arkelstein and De Linde vso) into the vision.
03Points of attention
04Can I take part?
05Exclusion grounds
- Compliance with the exclusion grounds in the ESPD (including criminal convictions, payment of taxes/social security contributions, insolvency, conflicts of interest).
- Sign a declaration that the Russia sanctions package (Regulation (EU) 2022/576) is not applicable.
06Award criteria
Insight into the approach and working method with which the Contractor intends to realize the building within the set frameworks, including how the contracting authority and users are heard and transparently involved.
07Process & timeline
08Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
09Likely competitors
10Tender documents
11Legal themes that may be relevant here
12Frequently asked questions
What selection requirements must a bidder meet?
What requirements are imposed on technical and professional competence?
What are the most important selection criteria for this assignment?
What is the substantive scope of the construction activities?
Automatically compiled from the official tender data and documents.
13Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159