Grid Automation 2.0

N.V. Rendo · Open · 1 lots · 418726
Type
Supplies
38800000 · Apparatus for monitori
Estimated value
Not published
To deadline
-9d
Jun 8, 2026 · 12:00
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
2 criteria
Assess manuallyconfidence high

Delivery and configuration of approximately 450 RTUs for the grid automation of N.V. RENDO over a period until the end of 2028. The assignment is executed via a phased batch delivery within a five-year agreement.

Supplies · Open · European procedure

European1 exclusion groundsComplete timeline
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
June 8, 2026
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Apparatus for monitoring industrial processes and for remote control
Location
Netherlands
CharacteristicsCPV 38SuppliesEU tender

01What is being requested

Designing, supplying, and configuring approximately 450 Remote Terminal Units (RTUs) including associated components for MV/LV distribution stations. The assignment includes a phased delivery in batches of approximately 50 units and has a contractual term of five years with five one-year extension options.

The present tender relates to contracting a supplier for the delivery of a complete measurement and telemetry solution for approx. 450 MV/LV transformers, to record the energy transport and the condition of RENDO's MV/LV distribution stations in the SCADA system. Deliveries will primarily take place in 2027 and 2028, whereby support, expansion, and maintenance for this system is guaranteed for at least five years.

38800000Supplies
1Grid Automation 2.0

02Strategic insight

Strategic insight · AI analysis
Ensure full compliance with the KES (Annex 6) to prevent exclusion in the first phase. Accurately integrate the IO list (Annex 13) into both the technical design and the price structure to avoid deviations. Take into account the phased delivery and the possibility for optimizations after each batch.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
Compliance with all minimum requirements in Annex 6 (KES) is a mandatory knock-out criterion.Important
The scope of the assignment may be adjusted by the contracting authority by a maximum of ±20%.Important
The bidder must take the IO list (Annex 13) into account for technical elaboration and pricing.Important
Engineering efforts per change should ideally be limited to a maximum of three (3) working days.Important
The installation manual must be drafted in the Dutch language.Important
All communication and submission takes place exclusively via Mercell.Important

04Can I take part?

Financial · 1
Financial and economic standing in accordance with the stated requirements.Financial
Technical · 2
Technical and professional ability.Technical
Compliance with all minimum requirements from Annex 6 - KES Grid Automation 2.0 RENDO (knock-out criterion).Technical
Professional capability · 1
Professional competence.Professional capability
Exclusion ground · 1
Compliance with grounds for exclusion.Exclusion ground

05Exclusion grounds

Exclusion grounds (1)
  • Compliance with grounds for exclusion.

06Award criteria

Qualitative award criterionweight n/a

Qualitative assessment of the submitted bid.

Quantitative award criteriaweight n/a

Assessment based on the pricing in the price list.

07Process & timeline

Publication on Mercell
2026-04-02
Deadline for submitting questions, first round of questions
2026-04-20T12:00:00+00:00
Target date for publication of first Memorandum of Information
2026-05-06
Deadline for submitting questions, second round of questions
2026-05-18T12:00:00+00:00
Target date for publication of second Memorandum of Information
2026-05-27
Deadline for submitting a Bid
2026-06-08T12:00:00+00:00
Target date for messages 1, 2, and 3 for Phase 2
2026-06-18
Presentations, questions, and demo
2026-06-25
Target date for sending provisional award decision
2026-06-30
End of standstill period
2026-07-20
Target date for sending final award decision
2026-07-21
Intended commencement date of Agreement
2026-07-22
Design ontwerp
2026-07-01 tot 2026-09-30
Levering eerste batch (Proof of Concept)
2026-09-30
Eerste reguliere batch levering
2026-12-01
Uiterste realisatie en operationalisering uitrol
2028-12-31

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

09Likely competitors

#Likely bidderFitWins
1Xylem Water Solutions Nederland B.V.SME65
2LNR Globalcom B.V.SME62
3Kanters B.V.SME60
4Eurofiber NederlandUnknown60
5SMELT EuropeUnknown57
6CG Drives & Automation Netherlands B.V.SME57

10Tender documents

Prijs.pdfpdfApr 4, 2026 · 29 KB
Eisen aan de inschrijver.pdfpdfApr 4, 2026 · 49 KB
Bijlage 2 - Verklaring combinatie Netautomatisering 2.0 RENDO.docxdocxApr 4, 2026 · 138 KB
Bijlage 10 - Procedure Klachtenafhandeling aanbesteding V1.0.pdfpdfApr 4, 2026 · 163 KB
Aanbestedingsleidraad Netautomatisering 2.0 RENDO.pdfpdfApr 4, 2026 · 882 KB
Bijlagen.pdfpdfApr 4, 2026 · 31 KB
Bijlage 14 - Contractmanagement RENDO.pdfpdfApr 4, 2026 · 454 KB
Bijlage 3 - Verklaring onderaanneming Netautomatisering 2.0 RENDO.docxdocxApr 4, 2026 · 138 KB
Bijlage 5 - Referentieformulier Netautomatisering 2.0 RENDO.docxdocxApr 4, 2026 · 138 KB
Beschrijving.pdfpdfApr 4, 2026 · 35 KB
Kwaliteit.pdfpdfApr 4, 2026 · 40 KB
Bijlage 11 - Sjabloon Geheimhoudingsovereenkomst N.V. RENDO - 3.0.pdfpdfApr 4, 2026 · 91 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the scope of the requested measurement and telemetry solution?
The assignment concerns the delivery of a complete solution for approximately 450 MV/LV transformers.
What is the technical objective of the assignment?
The solution must record the energy transport and the condition of the MV/LV distribution stations in the Rendo-SCADA system.
What are the timelines for delivery and support?
Deliveries will primarily take place in 2027 and 2028. Additionally, support, expansion, and maintenance for the system must be guaranteed for at least five years.
Which suitability criteria apply to the supplier?
Bidders must have proven experience with SCADA integration in industrial environments, be available for long-term after-sales support, and be able to deliver the technical solution within the specified delivery timelines.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 300K
median
€ 515K
p75
€ 1,7 mln
deze opdracht

Gegunde waarden in CPV 38 · leveringen n=331