The Province of Zuid-Holland intends to realise a new nature area of 290 ha in the polder between the Oude Rijn and the Meije. The project includes the creation of five water level areas where water flows in and out under free fall, with two inlets and the Meijevliet acting as the outlet. By retaining water, less non-local water is required and water quality is improved via an extended supply route (accordion of ditches) that primarily contains rainwater. Additionally, plots will be ploughed to create heathlands; these plots must be immediately sown with donor material from the surrounding area, while other areas turning black must be sown with a seed mixture. The works require expertise in water management, nature landscaping, and agricultural soil processing. The contracting authority expects an integrated approach that achieves both ecological and hydrological objectives.

Works · European procedure

European
Contracting authority
Zuid-Holland
Contract type
Works
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
's-Gravenhage, Zuid-Holland
CharacteristicsCPV 45WorksEU tendernature arealandscaping workswater level areas

01What is being requested

The Province of Zuid-Holland intends to realise a new nature area of 290 ha in the polder between the Oude Rijn and the Meije. The project includes the creation of five water level areas where water flows in and out under free fall, with two inlets and the Meijevliet acting as the outlet. By retaining water, less non-local water is required and water quality is improved via an extended supply route (accordion of ditches) that primarily contains rainwater. Additionally, plots will be ploughed to create heathlands; these plots must be immediately sown with donor material from the surrounding area, while other areas turning black must be sown with a seed mixture. The works require expertise in water management, nature landscaping, and agricultural soil processing. The contracting authority expects an integrated approach that achieves both ecological and hydrological objectives.

The intended contract concerns the landscaping of a new nature area of 290 ha in the heart of the polder between the Oude Rijn and the Meije, in the municipalities of Bodegraven-Reeuwijk and Woerden. In the area, five water level areas will be created where water flows in and out under free fall. Two inlets will be realised in the area and the Meijevliet will function as the outlet. By retaining the water, less non-local water is required, and by creating the extended supply route (accordion of ditches), the water quality in the area will increase (at the end of the accordion, this will consis

45000000Works
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9670×
2KWS Infra B.V.SME9192×
3Combinatie Heijmans - SWARCOUnknown9173×
4Heijmans Infra B.V.SME9165×
5Dura Vermeer Infra Regionale Projecten BVSME9158×
6Den Ouden Aannemingsbedrijf B.V.SME9023×

05Tender documents

TN434964 - SF01 Vooraankondiging 20231019090949pdfOct 19, 2023 · 19 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the size of the nature area to be realised?
The contract concerns the landscaping of a new nature area of 290 ha in the polder between the Oude Rijn and the Meije.
Which hydrological works will be carried out?
Five water level areas will be created where water flows in and out under free fall. For this, two inlets will be realised and the Meijevliet will be used as the outlet.
How will the water quality in the area be improved?
The water quality will increase through the creation of an extended supply route, consisting of an accordion of ditches, whereby the water at the end consists mainly of rainwater.
What works will be carried out for the heathlands?
Plots will be ploughed to create the right conditions for heathlands. These plots must be immediately sown with donor material from the surrounding area.
How should the sowing of the remaining parts be carried out?
The remaining areas turning black must be sown with a seed mixture.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159