The Hooge Platen is a 1,800-hectare Natura 2000 area in the Westerschelde, consisting of mud and sandflats. During high tide, almost the entire area is submerged, except for De Bol. The project focuses on strengthening the natural function by preserving and expanding breeding sites for coastal birds. To achieve this, a final design must be developed into an executive design. The approach is a soft solution via sand nourishment: a sand motor for De Bol, and an elevation for the Hooge Springer that remains above water even during high tide. The assignment requires a technical design, construction planning, environmental impact assessment, and compliance with Natura 2000 regulations.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€2,000,000
awarded value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Middelburg
CharacteristicsCPV 45WorksEU tenderNature RestorationSand NourishmentCoastal Birds

01What is being requested

The Hooge Platen is a 1,800-hectare Natura 2000 area in the Westerschelde, consisting of mud and sandflats. During high tide, almost the entire area is submerged, except for De Bol. The project focuses on strengthening the natural function by preserving and expanding breeding sites for coastal birds. To achieve this, a final design must be developed into an executive design. The approach is a soft solution via sand nourishment: a sand motor for De Bol, and an elevation for the Hooge Springer that remains above water even during high tide. The assignment requires a technical design, construction planning, environmental impact assessment, and compliance with Natura 2000 regulations.

The Hooge Platen is an 1,800-hectare Natura 2000 area consisting of mud and sandflats in the Westerschelde. During high tide, almost the entire Hooge Platen is submerged, with the exception of De Bol, a higher section on the western side. The project is aimed at strengthening the natural function of the Westerschelde by preserving and expanding the breeding site for coastal birds. For this purpose, a final design must be developed into an executive design. The starting point is a 'soft' solution by means of sand nourishment. For De Bol, this means the construction of a sand motor, and for the

45112310Works
1Lot 1

02Outcome

Awarded

Boskalis Nederland B.V.

Award value
€2,000,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10069×
2KWS Infra B.V.SME9492×
3Heijmans Infra B.V.SME9465×
4Dura Vermeer Infra Regionale Projecten BVSME9358×
5Ploegam B.V.SME9122×
6Van Oord Nederland BVSME9119×

06Tender documents

TN354962 - SF03 Aankondiging van een gegunde opdracht 20220728155956pdfJul 28, 2022 · 25 KB
TN354962 - SF02 Aankondiging van een opdracht 20220325094408pdfMar 25, 2022 · 28 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the objective of the assignment Nature Restoration Measure 252?
The project is aimed at strengthening the natural function of the Westerschelde by preserving and expanding the breeding site for coastal birds in the 1,800-hectare Natura 2000 area.
Which technical approach is being used for the nature restoration measures?
A 'soft' solution via sand nourishment has been chosen. A sand motor will be constructed for De Bol, and an elevation will be realized for the Hooge Springer that remains above water even during high tide.
Which technical works must be carried out?
The assignment includes developing a final design into an executive design, including a technical design, construction planning, environmental impact assessment, and compliance with Natura 2000 regulations.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 2,0 mln

Gegunde waarden in CPV 45 · werken n=3159