National public tender Flora 23 phase 2 on behalf of Municipality of Doesburg

Gemeente Doesburg · Open · 1 lots · 426213
Type
Works
45230000 · Installation of pipeli
Estimated value
Not published
To deadline
13d
Jun 29, 2026 · 08:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

Redesign of the public space in the Ribesstraat, Prunusstraat and Van Tuyllplein neighborhoods, including the replacement of the sewer system to a separated system.

Works · Open · National procedure

Sustainability countsComplete timeline
Contracting authority
Gelderland
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
June 29, 2026
08:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Installation of pipelines, communication lines and power lines, highways, roads, airfields and railways; paving
Location
Doesburg, Gelderland
CharacteristicsCPV 45WorksGreen / SPPSewer replacementRedesignClimate-adaptive

01What is being requested

The redesign of the Prunusstraat, Ribesstraat and van Tuylplein, whereby the combined sewer system is replaced by a new separated system and water storage is realized in the immediate vicinity. The works include, among other things, breaking up asphalt, earthworks, sewerage works and paving works. The landscaping and lighting do not form part of this scope.

In the vicinity of the location Ribesstraat-Van Tuyllplein- Prunusstraat, Woningcorporatie Stichting Woonservice IJsselland previously demolished dated PéGé houses in the De Ooi district and replaced them with new, life-cycle resistant ground-bound houses and apartments. These were recently completed. The manner in which the new houses are positioned has consequences for the public space. Can be used to improve the public space around the houses. This must be redesigned in a new and sustainable climate-adaptive manner, during which the sewerage, dating from the 1960s, is replaced, and a separ

45230000Works
1National public tender Flora 23 phase 2 on behalf of Municipality of Doesburg

02Strategic insight

Strategic insight · AI analysis
<ul Ensure strict compliance with the Schoon en Emissieloos Bouwen Roadmap, as the emission requirements for equipment are a mandatory part of the agreement. Check whether all mandatory annexes (such as the UEA and the EMVI performance measurement) are correctly prepared and provided with the required digital or wet signature. If you make use of the reliance on third parties, ensure that all relevant entities complete and sign a UEA.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The assignment must comply with the Basic Level Contract Requirements of the Schoon en Emissieloos Bouwen (SEB) Roadmap for mobile machinery, construction transport and sailing construction equipment.Important
Bids must be submitted fully digitally via TenderNed.Important
Documents requiring a wet signature must be scanned in or provided with an advanced electronic signature.Important
The assignment is carried out on the basis of a RAW specification and the UAV 2012 is applicable.Important
Communication takes place exclusively via TenderNed; information outside this platform will be considered not submitted.Important

04Can I take part?

Financial — Comply with the stated requirements regarding grounds for exclusion and financial and economic standing.
Technical — Comply with the stated requirements regarding technical and/or professional competence.

05Award criteria

Best price-quality ratio (best PKV)weight n/a

Award criterion where quality is also taken into account alongside the price.

06Process & timeline

Dispatch of announcement
22 mei 2026
Closing period for submitting questions
8 juni 2026 10:00 uur
Availability of Note of Instruction
16 juni 2026
Closing of tender period
29 juni 2026 10:00 uur
Evaluation of bids
Week 27 en 28
Expected communication of award decision
Week 28
Intended commencement date of agreement
1 augustus 2026

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME9977×
2KWS Infra B.V.SME9892×
3Van Gelder BVSME9853×
4Heijmans Infra B.V.SME9865×
5Dura Vermeer Infra Regionale Projecten BVSME9858×
6D. van der Steen B.V.SME9831×

09Tender documents

Voorbeeld opleverdosierpdfMay 22, 2026 · 38 KB
26.37.0016.3 719473 Fase 3 Tuyllplein Doesburg v1pdfMay 22, 2026 · 467 KB
Formulier prestatieniveaudocxMay 22, 2026 · 82 KB
A23DOE002-006_011_D01_V&G-PLAN ONTWERPFASEpdfMay 22, 2026 · 232 KB
A23DOE002-006_011_D01_V&G-PLAN ONTWERPFASE BIJLAGEpdfMay 22, 2026 · 122 KB
A23DOE002-006_009_D01_BESTEK (3)pdfMay 22, 2026 · 893 KB
405915 Rapportage infrastructureel onderzoek Flora 23 te Doesburg (Buro Antares 5-12-2025)pdfMay 22, 2026 · 8349 KB
26.37.0016.2 719473 Fase 2 Prunusstraat Doesburg plan defpdfMay 22, 2026 · 717 KB
26.37.0016.1 719473 Fase 1 Ribesstraat Doesburg v1pdfMay 22, 2026 · 487 KB
A23DOE002-006_013_D01_Toelichting EMVI-Prestatie (1)pdfMay 22, 2026 · 303 KB
A23DOE002-006_3002 VerkeerstekeningpdfMay 22, 2026 · 447 KB
Bijlage C - ReferentieopdrachtdocxMay 22, 2026 · 49 KB

10Legal themes that may be relevant here

11Frequently asked questions

What quality requirements apply to the bidder?
Bidders must possess a quality system relating to the nature of the work, in accordance with the UAV, article 01.13.02.
What experience is required for participation in this tender?
The bidder is expected to have demonstrable experience with sewerage works and paving works.
What logistical restrictions apply during execution?
It is not possible to use the municipal depots at the Koppelweg or Looiersweg. Additionally, there is a strict restriction on transport routes, whereby no route past the Anne Frank school may be used.
What is the intended completion date and the schedule of the works?
The work must be completed before March 2027. The utility works start in week 21 and have a duration of approximately 11 weeks.

Automatically compiled from the official tender data and documents.