ClosedWorksEuropeanOpen

Post-treatment in the form of an additional purification step in Rioolwaterzuiveringsinstallatie Amstelveen

Stichting Waternet · Open · 1 lots · 364214
Type
Works
45000000
Estimated value
€ 35M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The tender concerns an additional purification step for the RWZI Amstelveen with the aim of improving the Amstel water quality. The technical objectives include an 80% removal of micropollutants, phosphorus reduction to 0.25 mg P/l, nitrogen reduction to 5 mg N/l, and disinfection to 1,800 cfu E.coli/dl. An expansion of the existing plant is required for this work.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€35,000,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The tender concerns an additional purification step for the RWZI Amstelveen with the aim of improving the Amstel water quality. The technical objectives include an 80% removal of micropollutants, phosphorus reduction to 0.25 mg P/l, nitrogen reduction to 5 mg N/l, and disinfection to 1,800 cfu E.coli/dl. An expansion of the existing plant is required for this work.

The subject project concerns an additional purification step at the RWZI Amstelveen that achieves an improvement in the water quality of the Amstel through better effluent quality. To achieve this, the technical objectives for the entire purification process, including the expansion, are as follows: [newline]- removal of micropollutants of at least 80% relative to the wastewater entering the RWZI (for the subsidy from the Ministry of Infrastructure and Water Management, a purification performance of at least 80% applies); [newline]- extensive nutrient removal relative to the current effluent

45000000€ 35MWorks
1Post-treatment in the form of an additional purification step in Rioolwaterzuiveringsinstallatie Amstelveen€35,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€35,000,000

04Likely competitors

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BVSME9658×
2Van Gelder BVSME9553×
3ENGIE Infra & Mobility B.V.SME9469×
4Den Ouden Aannemingsbedrijf B.V.SME9423×
5Van Hattum & Blankevoort N.V.SME9319×
6MobilisUnknown9019×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the additional purification step at RWZI Amstelveen?
The project concerns an additional purification step that must improve the water quality of the Amstel by achieving better effluent quality. For this purpose, an expansion of the existing plant is necessary.
What technical requirements must the removal of micropollutants meet?
A removal of micropollutants of at least 80% must be achieved relative to the wastewater entering the RWZI.
Which standards apply to the nutrient removal (phosphorus and nitrogen)?
The effluent may not contain more than 0.25 milligrams of phosphorus per liter of wastewater (based on a moving annual average). The effluent concentration of nitrogen may not exceed 5 milligrams per liter of wastewater (over a moving annual average).
What requirement is set for the disinfection step?
A disinfection step must be realized up to 1,800 cfu E.coli/dl to promote the swimming water quality in the Amstel.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 35 mln

Gegunde waarden in CPV 45 · werken n=3159