AwardedWorksOpen

Museum Plus, design & build

Gemeente Waalwijk · Open · 1 lots · 158827
Type
Works
45212313
Estimated value
€ 3,34M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Waalwijk is looking for an experienced design & build partner for the shoe museum. Within a project budget of € 3,340,000.00 excl. VAT, the agency must deliver the complete interior design, aligned with the architectural and installation design of CIVIC Architects. Additionally, the agency must advise sub-consultants regarding furniture, lighting, colors, and materialization, to ensure the museum's appearance is optimal. As the main contractor, the agency will realize and execute the interior design according to the specifications to be established. The procedure is public; collaboration with the contracting authority, future user, sub-consultants, and sub-contractors is essential. The assignment requires an integrated approach, strict budget control, and a high degree of creativity and technical insight.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
€3,340,000
estimated value
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Waalwijk
CharacteristicsCPV 45Worksmuseuminterior designCIVIC Architects

01What is being requested

The Municipality of Waalwijk is looking for an experienced design & build partner for the shoe museum. Within a project budget of € 3,340,000.00 excl. VAT, the agency must deliver the complete interior design, aligned with the architectural and installation design of CIVIC Architects. Additionally, the agency must advise sub-consultants regarding furniture, lighting, colors, and materialization, to ensure the museum's appearance is optimal. As the main contractor, the agency will realize and execute the interior design according to the specifications to be established. The procedure is public; collaboration with the contracting authority, future user, sub-consultants, and sub-contractors is essential. The assignment requires an integrated approach, strict budget control, and a high degree of creativity and technical insight.

Within the project planning (appendix 2), within the available project budget of € 3,340,000.00 excl. VAT, and in good cooperation with the contracting authority, future user, sub-consultants, and sub-contractors: - The creation of the design for the interior of the shoe museum in the broadest sense, which is seamlessly aligned with the architectural and installation design being created simultaneously by CIVIC Architects and tbc consultants; - Advising sub-consultants regarding their design, where this influences the appearance (the look and feel) of the shoe museum. This includes, for examp

45212313€ 3,34MWorks
1Lot 1€3,340,000

02Outcome

Awarded

Tinker Imagineers B.V.

Award value
€3,340,000
vs. estimate
0%

03Value in context

€3,340,000

04Bidders in this segment

#Likely bidderFitWins
1Van Gelder BVSME9253×
2BINX Smartility B.V.SME8927×
3BAM Bouw en Techniek bvSME8734×
4Heijmans Utiliteit B.V.SME8627×
5Den Ouden Aannemingsbedrijf B.V.SME8523×
6GKB Realisatie B.V.SME8521×

05Tender documents

TN214207 - SF03 Aankondiging van een gegunde opdracht 20210521131751pdfMay 21, 2021 · 26 KB
Nota van Inlichtingen 2 2019.03.21pdfMar 21, 2019 · 380 KB
Schetsontwerp Civic 20190313pdfMar 13, 2019 · 3278 KB
Bijlage 3 concept overeenkomst 20190313pdfMar 13, 2019 · 304 KB
Formulier 1 UEA 20190313pdfMar 13, 2019 · 268 KB
Nota van inlichtingen 1 20190313pdfMar 13, 2019 · 636 KB
Formulier 4 Eisen 20190313docxMar 13, 2019 · 23 KB
Bijlage 9 Ontwerpvisie CIVIC 20190220pdfFeb 20, 2019 · 4094 KB
Bijlage 8 RaadsvoorstelpdfFeb 18, 2019 · 340 KB
Bijlage 1 gh waalwijk_totaal_dxfzipFeb 18, 2019 · 524 KB
Bijlage 3 Concept overeenkomstpdfFeb 18, 2019 · 68 KB
Bijlage 1 gh waalwijk_totaal_pdfzipFeb 18, 2019 · 1019 KB

06Legal themes that may be relevant here

07Frequently asked questions

What does the assignment for Museum Plus entail?
The assignment includes designing the interior of the shoe museum, where the design must seamlessly align with the architectural and installation design of CIVIC Architects. Additionally, the contractor advises sub-consultants on matters such as lighting, furniture, colors, and materialization.
What responsibilities does the contractor have during realization?
The contractor acts as the main contractor and is responsible for the realization and execution of the interior design, fully in accordance with the specifications to be established.
Which parties must be collaborated with?
Work must be carried out in good cooperation with the contracting authority, the future user, sub-consultants, and sub-contractors to achieve the desired result for the shoe museum.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,3 mln

Gegunde waarden in CPV 45 · werken n=3159